Sustainable Energy Group Inc

How many solar installs has Sustainable Energy Group Inc done in California, and which license number is on its installs?

Sustainable Energy Group Inc has 556 residential solar installs interconnected in California, active in the records from 2006 through 2026 (May 1, 2006 to Apr 16, 2026), most of them in Nevada County (483), Placer County (53) and Yuba County (7). The license number recorded on most of its installs, 868816, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
556
Last 24 months
47
Total capacity
4,463.4 kW DC
Median system size
7.5 kW DC
With battery storage
15.6% all time; 74.5% last 24 months
Third-party owned
0.0% of 556 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
40 installs, latest Mar 17, 2026
Ownership types recorded
none recorded
Median battery size
18.5 kWh (51 installs list a capacity)
First install
May 1, 2006
Latest install
Apr 16, 2026
Counties
10
Utilities
PGE 556
CSLB license
868816

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200650
200720
200850
2009100
201070
201170
2012140
2013170
2014190
2015280
2016320
2017280
2018350
2019450
2020241
20216418
20227319
2023817
20242515
20252319
2026 (through Aug 31, 2026)128

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

40 of its 556 interconnected installs (7.2% of the 556 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.5% of those include battery storage. The latest Net Billing Tariff install was approved Mar 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.015127.2%not counted
NEM 2.036565.6%47 (12.9%)
Net Billing Tariff407.2%37 (92.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sustainable Energy Group Inc’s installs. No residential system in the file lists a third-party owner name that matches Sustainable Energy Group Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 42 of Sustainable Energy Group Inc’s 47 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (18, 42.9%) used modules recorded as Qcells.

In the last 24 months, 47 of Sustainable Energy Group Inc’s 47 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (23, 48.9%) used inverters recorded as SolarEdge.

In the last 24 months, 33 of Sustainable Energy Group Inc’s 47 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (19, 57.6%) used batteries recorded as SolarEdge.

66 of 87 battery-paired PG&E and SCE installs (75.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells18147
REC847
LONGi7not in top list
Sunspark Technology6not in top list
Mission Solar2not in top list
Inverter makerSolarEdge23409
Enphase2289
Sol-Ark310
OutBack Power1not in top list
SMA157
Battery makerSolarEdge1940
Enphase1417

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 510 of 556 installs, inverters on 556. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sustainable Energy Group Inc as developer on 48 battery storage projects and as installer on 48 (48 name it as both), 48 projects in all with 802 kWh of storage. 23 have the status Paid, with $162,165 in current incentive allocations. Applications were received from Jun 1, 2020 to Dec 9, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid23294$162,165
Reserved219$2,868
Cancelled23489$388,569

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency26513$504,37711$136,600
Small Residential Storage20256$40,89612$25,565
Large-Scale Storage233$8,3280$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
868816Not found in the CSLB License Master file pulled Nov 4, 2026483

License numbers are the ones the utilities recorded on the interconnection applications (483 of 556 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Nevada483
Placer53
Yuba7
El Dorado4
Butte2
Solano2
Sutter2
Kern1
Sierra1
Yolo1

Top cities

CityInstalls
Grass Valley243
Nevada City144
Penn Valley64
Auburn37
Rough And Ready13
Colfax11
Smartsville8
Rocklin3
Browns Valley2
Cameron Park2
Dobbins2
Fairfield2
Granite Bay2
Lincoln2
Newcastle2

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUSTAINABLE ENERGY GROUP INC313
Sustainable Energy Group Inc147
Sustainable Energy Group Inc.46
Sustainable Energy Group31
Sustainable Energy Group, Inc.11
Sustainable Energy Group, Inc4
sustainable Energy Group Inc2
Sustainable energy Group Inc1
sustainable Energy Group Inc.1

Common questions

Where does Sustainable Energy Group Inc install solar?

Its installs are spread across 10 counties. The most are in Nevada County (483 installs), followed by Placer County (53).

How often does Sustainable Energy Group Inc install batteries with solar?

15.6% of its interconnected solar installs include battery storage across all years, and 74.5% in the last 24 months (35 of 47).

How many Sustainable Energy Group Inc installs are under NEM 3.0 (the Net Billing Tariff)?

40 of its 556 interconnected installs (7.2% of the 556 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.