Future Energy Corporation: latest installs on record in California
Is Future Energy Corporation still installing solar in California?
The most recent install credited to Future Energy Corporation in California’s interconnection data was approved in August 2026; it has 124 in the last 12 complete months (September 2025 through August 2026). CSLB lists license 463720 (FUTURE ENERGY SAVERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-17, C-20, C-46, expires Oct 31, 2028, the number recorded on 79 of those installs.
The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.
The installs credited to Future Energy Corporation in the last 12 complete months carry more than one CSLB license number: 463720 on 79 (CSLB holder FUTURE ENERGY SAVERS, Wilton) and 1024289 on 45 (CSLB holder FUTURE ENERGY, Van Nuys), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Latest install approved
- Aug 26, 2026
- Last 12 complete months
- 124 installs, September 2025 through August 2026
- Last 24 months
- 245 installs
- All time
- 5,746 installs, first approved Sep 18, 2006
- License on most recent installs
- 463720, FUTURE ENERGY SAVERS, CSLB status CLEAR in the License Master file pulled Nov 4, 2026
- Full record
- Future Energy Corporation installer page
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs in each of the last 12 complete months
| Month approved | Installs credited to Future Energy Corporation |
|---|---|
| August 2026 | 5 |
| July 2026 | 6 |
| June 2026 | 2 |
| May 2026 | 8 |
| April 2026 | 8 |
| March 2026 | 7 |
| February 2026 | 12 |
| January 2026 | 20 |
| December 2025 | 22 |
| November 2025 | 5 |
| October 2025 | 12 |
| September 2025 | 17 |
| Total | 124 |
Net Billing Tariff installs
313 of the installs credited to Future Energy Corporation (5.4% of the 5,746 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.0% of those include battery storage. The latest was approved Aug 26, 2026.
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2006 | 2 | 0 |
| 2007 | 0 | 0 |
| 2008 | 11 | 0 |
| 2009 | 56 | 0 |
| 2010 | 147 | 0 |
| 2011 | 366 | 0 |
| 2012 | 466 | 0 |
| 2013 | 689 | 0 |
| 2014 | 801 | 0 |
| 2015 | 614 | 0 |
| 2016 | 524 | 0 |
| 2017 | 308 | 0 |
| 2018 | 249 | 0 |
| 2019 | 354 | 39 |
| 2020 | 126 | 2 |
| 2021 | 187 | 75 |
| 2022 | 265 | 123 |
| 2023 | 256 | 120 |
| 2024 | 123 | 101 |
| 2025 | 134 | 128 |
| 2026 (through Aug 31, 2026) | 68 | 58 |
License numbers on installs in the last 12 months
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Expires | Installs |
|---|---|---|---|---|---|
| 463720 | FUTURE ENERGY SAVERS | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-17; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar Contractor | Oct 31, 2028 | 79 |
| 1024289 | FUTURE ENERGY | CLEAR | B General Building Contractor; C-10 Electrical Contractor | Mar 31, 2027 | 45 |
Names written on these installs: FUTURE ENERGY SAVERS (79), FUTURE ENERGY (45). 124 of the 124 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos.
Other installer names in the records
Installer names that share a license number with Future Energy Corporation, or contain the same brand word. A shared word or number does not by itself mean the same company.
| Installer | Why listed | Latest install | Last 12 months | All time |
|---|---|---|---|---|
| SOUTH COAST COMMERICAL ELECTRIC INC | same license 1024289 | September 2022 | 0 | 101 |
How to read this record
Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.
To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.
Common questions
When was the last install credited to Future Energy Corporation approved?
The latest App Approved date on an install credited to Future Energy Corporation is Aug 26, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Sep 18, 2006.
How many solar installs has Future Energy Corporation had in California in the last 12 months?
124 residential solar installs credited to Future Energy Corporation were approved for interconnection from September 2025 through August 2026. Across all years it has 5,746.
Does a recent install mean Future Energy Corporation is still in business?
No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
Records last pulled Nov 16, 2026. Every entry links to the original public record.