SOUTH COAST COMMERICAL ELECTRIC INC

How many solar installs has SOUTH COAST COMMERICAL ELECTRIC INC done in California, and which license number is on its installs?

SOUTH COAST COMMERICAL ELECTRIC INC has 101 residential solar installs interconnected in California, active in the records from 2017 through 2022 (Nov 8, 2017 to Sep 21, 2022), most of them in Los Angeles County (39), Tulare County (20) and San Bernardino County (14). CSLB lists license 1024289 (FUTURE ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
101
Last 24 months
0
Total capacity
699.3 kW DC
Median system size
5.9 kW DC
With battery storage
2.0% all time; no installs in the last 24 months last 24 months
Third-party owned
1.0% of 101 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 1
Median battery size
9.8 kWh (2 installs list a capacity)
First install
Nov 8, 2017
Latest install
Sep 21, 2022
Counties
9
Utilities
SCE 101
CSLB license
1024289

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201730
2018280
2019330
2020302
202150
202220
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 101 interconnected installs with a tariff recorded (101) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0101100.0%2 (2.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of SOUTH COAST COMMERICAL ELECTRIC INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SOUTH COAST COMMERICAL ELECTRIC INC exactly.

Third-party owner named on its installsInstalls
FUTURE ENERGY1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 101 of SOUTH COAST COMMERICAL ELECTRIC INC’s 101 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (18, 17.8%) used modules recorded as LG.

Across all years, 101 of SOUTH COAST COMMERICAL ELECTRIC INC’s 101 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (52, 51.5%) used inverters recorded as SolarEdge.

Across all years, 2 of SOUTH COAST COMMERICAL ELECTRIC INC’s 101 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as LG.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG018
Panasonic018
Solaria014
Hyundai013
Canadian Solar011
Inverter makerSolarEdge052
Enphase046
SunPower03
Battery makerLG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 101 of 101 installs, inverters on 101. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1024289FUTURE ENERGY (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorMar 3, 2017Mar 31, 2027101

License numbers are the ones the utilities recorded on the interconnection applications (101 of 101 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1024289. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SOUTH COAST COMMERICAL ELECTRIC INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019Total
City and County of San Francisco1024289224
unincorporated Marin County1024289101

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles39
Tulare20
San Bernardino14
Riverside10
Kings8
Ventura5
Orange3
Kern1
Santa Barbara1

Top cities

CityInstalls
Hanford8
Lancaster6
Visalia4
Fontana3
Porterville3
San Dimas3
Saugus3
Tulare3
Agoura Hills2
Corona2
Highland2
Lindsay2
Norwalk2
Oxnard2
Palmdale2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOUTH COAST COMMERICAL ELECTRIC INC101

Common questions

Where does SOUTH COAST COMMERICAL ELECTRIC INC install solar?

Its installs are spread across 9 counties. The most are in Los Angeles County (39 installs), followed by Tulare County (20).

How often does SOUTH COAST COMMERICAL ELECTRIC INC install batteries with solar?

2.0% of its interconnected solar installs include battery storage across all years.

How many SOUTH COAST COMMERICAL ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 101 interconnected installs with a tariff recorded (101) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.