GRID Alternatives: latest installs on record in California

Is GRID Alternatives still installing solar in California?

The most recent install credited to GRID Alternatives in California’s interconnection data was approved in August 2026; it has 805 in the last 12 complete months (September 2025 through August 2026). CSLB lists license 867533 (GRID ALTERNATIVES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Nov 30, 2027, the number recorded on 805 of those installs.

The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.

Latest install approved
Aug 31, 2026
Last 12 complete months
805 installs, September 2025 through August 2026
Last 24 months
1,248 installs
All time
13,679 installs, first approved Mar 2, 2006
License on most recent installs
867533, GRID ALTERNATIVES, CSLB status CLEAR in the License Master file pulled Nov 4, 2026
Full record
GRID Alternatives installer page

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs in each of the last 12 complete months

Month approvedInstalls credited to GRID Alternatives
August 202661
July 202663
June 202672
May 202656
April 202654
March 202672
February 202635
January 202645
December 202592
November 202573
October 2025108
September 202574
Total805

Net Billing Tariff installs

1,783 of the installs credited to GRID Alternatives (13.0% of the 13,679 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.6% of those on PG&E and SCE records include battery storage. The latest was approved Aug 31, 2026.

Installs by year

YearInstalls interconnectedWith battery storage
2006160
2007480
2008570
20091000
20102690
20115870
20121,1340
20139620
20148390
20159380
20168840
20171,1970
20181,0670
20199410
20207000
20216400
20227274
20237410
202474826
2025626458
2026 (through Aug 31, 2026)458250

License numbers on installs in the last 12 months

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsExpiresInstalls
867533GRID ALTERNATIVESCLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorNov 30, 2027805

Names written on these installs: GRID ALTERNATIVES (780), Grid Alternatives (24), GRID Alternatives, Inc (1). 805 of the 805 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos.

Other installer names in the records

Installer names that share a license number with GRID Alternatives, or contain the same brand word. A shared word or number does not by itself mean the same company.

InstallerWhy listedLatest installLast 12 monthsAll time
GRID Alternatives North Valley, Inc.same license 867533July 20240291

How to read this record

Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.

To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.

Common questions

When was the last install credited to GRID Alternatives approved?

The latest App Approved date on an install credited to GRID Alternatives is Aug 31, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Mar 2, 2006.

How many solar installs has GRID Alternatives had in California in the last 12 months?

805 residential solar installs credited to GRID Alternatives were approved for interconnection from September 2025 through August 2026. Across all years it has 13,679.

Does a recent install mean GRID Alternatives is still in business?

No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.