Powur PBC (Powur Home): latest installs on record in California
Is Powur PBC (Powur Home) still installing solar in California?
The most recent install credited to Powur PBC (Powur Home) in California’s interconnection data was approved in August 2026; it has 448 in the last 12 complete months (September 2025 through August 2026). CSLB lists license 1060243 (POWUR HOME CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2027, the number recorded on 448 of those installs.
The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.
- Latest install approved
- Aug 28, 2026
- Last 12 complete months
- 448 installs, September 2025 through August 2026
- Last 24 months
- 907 installs
- All time
- 7,373 installs, first approved Apr 24, 2020
- License on most recent installs
- 1060243, POWUR HOME CONSTRUCTION, CSLB status CLEAR in the License Master file pulled Nov 4, 2026
- Full record
- Powur PBC (Powur Home) installer page
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs in each of the last 12 complete months
| Month approved | Installs credited to Powur PBC (Powur Home) |
|---|---|
| August 2026 | 21 |
| July 2026 | 35 |
| June 2026 | 18 |
| May 2026 | 28 |
| April 2026 | 33 |
| March 2026 | 42 |
| February 2026 | 53 |
| January 2026 | 59 |
| December 2025 | 59 |
| November 2025 | 28 |
| October 2025 | 31 |
| September 2025 | 41 |
| Total | 448 |
Net Billing Tariff installs
1,030 of the installs credited to Powur PBC (Powur Home) (14.0% of the 7,373 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.4% of those on PG&E and SCE records include battery storage. The latest was approved Aug 28, 2026.
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2020 | 5 | 0 |
| 2021 | 78 | 7 |
| 2022 | 1,527 | 86 |
| 2023 | 4,090 | 195 |
| 2024 | 913 | 324 |
| 2025 | 471 | 316 |
| 2026 (through Aug 31, 2026) | 289 | 235 |
License numbers on installs in the last 12 months
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Expires | Installs |
|---|---|---|---|---|---|
| 1060243 | POWUR HOME CONSTRUCTION | CLEAR, Pending Case/CIT | B General Building Contractor; C-10 Electrical Contractor | Nov 30, 2027 | 448 |
Names written on these installs: POWUR PBC DBA POWUR HOME CONSTRUCTION (342), POWUR P B C WHICH WILL DO BUSINESS IN CALIFORNIA A (82), POWUR P B C WHICH WILL DO BUSINESS IN CALIFORNIA AS POWUR HOME (12), POWUR PBC WHICH WILL DO BUSINESS IN CALIFORNIA AS POWUR HOME (12). 448 of the 448 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos.
Other installer names in the records
Installer names that share a license number with Powur PBC (Powur Home), or contain the same brand word. A shared word or number does not by itself mean the same company.
| Installer | Why listed | Latest install | Last 12 months | All time |
|---|---|---|---|---|
| POWUR HOME CONSTRUCTION | same license 1060243 | August 2026 | 246 | 690 |
How to read this record
Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.
To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.
Common questions
When was the last install credited to Powur PBC (Powur Home) approved?
The latest App Approved date on an install credited to Powur PBC (Powur Home) is Aug 28, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Apr 24, 2020.
How many solar installs has Powur PBC (Powur Home) had in California in the last 12 months?
448 residential solar installs credited to Powur PBC (Powur Home) were approved for interconnection from September 2025 through August 2026. Across all years it has 7,373.
Does a recent install mean Powur PBC (Powur Home) is still in business?
No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
Records last pulled Nov 16, 2026. Every entry links to the original public record.