The most recent install credited to SolarMax Renewable Energy Provider, Inc in California’s interconnection data was approved in August 2026; it has 591 in the last 12 complete months (September 2025 through August 2026). CSLB lists license 972048 (SOLARMAX RENEWABLE ENERGY PROVIDER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Apr 30, 2028, the number recorded on 590 of those installs.
The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.
- Latest install approved
- Aug 28, 2026
- Last 12 complete months
- 591 installs, September 2025 through August 2026
- Last 24 months
- 1,069 installs
- All time
- 9,606 installs, first approved Sep 13, 2012
- License on most recent installs
- 972048, SOLARMAX RENEWABLE ENERGY PROVIDER INC, CSLB status CLEAR in the License Master file pulled Nov 4, 2026
- Full record
- SolarMax Renewable Energy Provider, Inc installer page
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs in each of the last 12 complete months
| Month approved | Installs credited to SolarMax Renewable Energy Provider, Inc |
|---|---|
| August 2026 | 57 |
| July 2026 | 48 |
| June 2026 | 45 |
| May 2026 | 71 |
| April 2026 | 83 |
| March 2026 | 41 |
| February 2026 | 59 |
| January 2026 | 59 |
| December 2025 | 71 |
| November 2025 | 11 |
| October 2025 | 15 |
| September 2025 | 31 |
| Total | 591 |
Net Billing Tariff installs
1,025 of the installs credited to SolarMax Renewable Energy Provider, Inc (10.7% of the 9,605 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.0% of those on PG&E and SCE records include battery storage. The latest was approved Aug 28, 2026.
Systems that list SolarMax as third-party owner
Leased and PPA systems carry a Third Party Name on the interconnection record, whoever installed them. These owner names contain “solarmax” as a whole word. They are listed separately because the record does not say whether two spellings are the same legal entity.
| Third-party owner as recorded | Residential systems |
|---|---|
| Solarmax | 808 |
From the 200 most common owner names in the DG Stats file current through Aug 31, 2026. The record does not show later transfers of a contract or portfolio, and it does not show what happens to a lease or PPA.
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2012 | 1 | 0 |
| 2013 | 46 | 0 |
| 2014 | 62 | 0 |
| 2015 | 484 | 0 |
| 2016 | 806 | 5 |
| 2017 | 826 | 0 |
| 2018 | 979 | 1 |
| 2019 | 1,060 | 18 |
| 2020 | 829 | 40 |
| 2021 | 859 | 114 |
| 2022 | 1,098 | 138 |
| 2023 | 1,233 | 153 |
| 2024 | 406 | 246 |
| 2025 | 454 | 363 |
| 2026 (through Aug 31, 2026) | 463 | 429 |
License numbers on installs in the last 12 months
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Expires | Installs |
|---|---|---|---|---|---|
| 972048 | SOLARMAX RENEWABLE ENERGY PROVIDER INC | CLEAR | C-10 Electrical Contractor; C-46 Solar Contractor | Apr 30, 2028 | 590 |
Names written on these installs: SOLARMAX RENEWABLE ENERGY PROVIDER INC (575), Solarmax Renewable Energy Provider, (16). 590 of the 591 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos.
Other installer names in the records
Installer names that share a license number with SolarMax Renewable Energy Provider, Inc, or contain the same brand word. A shared word or number does not by itself mean the same company.
| Installer | Why listed | Latest install | Last 12 months | All time |
|---|---|---|---|---|
| Solarmax Renewable | same license 972048; name contains “solarmax” | November 2015 | 0 | 635 |
| Solarmax | same license 972048; name contains “solarmax” | September 2019 | 0 | 612 |
How to read this record
Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.
To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.
Common questions
When was the last install credited to SolarMax approved?
The latest App Approved date on an install credited to SolarMax Renewable Energy Provider, Inc is Aug 28, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Sep 13, 2012.
How many solar installs has SolarMax had in California in the last 12 months?
591 residential solar installs credited to SolarMax Renewable Energy Provider, Inc were approved for interconnection from September 2025 through August 2026. Across all years it has 9,606.
How many California solar systems list SolarMax as the third-party owner?
In the DG Stats file current through Aug 31, 2026, 808 residential systems list “Solarmax” as the third-party owner (lease or PPA), counted separately because the spellings differ. The record shows the owner named when each system was connected. It does not show what happens to a lease or PPA contract; those terms are in the contract itself.
Does a recent install mean SolarMax is still in business?
No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
Records last pulled Nov 16, 2026. Every entry links to the original public record.