Solarmax Renewable

How many solar installs has Solarmax Renewable done in California, and which license number is on its installs?

Solarmax Renewable has 635 residential solar installs interconnected in California, active in the records from 2012 through 2015 (Oct 24, 2012 to Nov 17, 2015), most of them in Riverside County (228), Los Angeles County (192) and San Bernardino County (141). CSLB lists license 972048 (SOLARMAX RENEWABLE ENERGY PROVIDER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
635
Last 24 months
0
Total capacity
3,614.1 kW DC
Median system size
5.3 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
50.0% of 4 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 1, other 1
First install
Oct 24, 2012
Latest install
Nov 17, 2015
Counties
5
Utilities
SCE 635
CSLB license
972048

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201220
201380
20143290
20152960
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 635 interconnected installs with a tariff recorded (635) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0635100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of Solarmax Renewable’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Solarmax Renewable exactly.

Third-party owner named on its installsInstalls
Raya, Maria1
SunPower Solar Program 1, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 634 of Solarmax Renewable’s 635 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (249, 39.3%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Inverter makerSMA0249
Delta Electronics0136
SolarEdge0120
Enphase080
ABB030

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 0 of 635 installs, inverters on 634. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
972048SOLARMAX RENEWABLE ENERGY PROVIDER INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorApr 12, 2012Apr 30, 2028635

License numbers are the ones the utilities recorded on the interconnection applications (635 of 635 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 972048. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Solarmax Renewable’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County972048313214171310832130

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside228
Los Angeles192
San Bernardino141
Orange65
Ventura9

Top cities

CityInstalls
Riverside39
Corona35
Moreno Valley26
Rancho Cucamonga18
Perris17
Arcadia16
Chino15
Murrieta13
Apple Valley12
Beaumont12
Fontana12
Rowland Heights12
Winchester12
Diamond Bar11
Hemet11

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLARMAX RENEWABLE409
Solarmax Renewable200
SolarMax Renewable26

Common questions

Where does Solarmax Renewable install solar?

Its installs are spread across 5 counties. The most are in Riverside County (228 installs), followed by Los Angeles County (192).

How often does Solarmax Renewable install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Solarmax Renewable installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 635 interconnected installs with a tariff recorded (635) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.