How many homes in ZIP code 90043 have solar?

PG&E, SCE and SDG&E interconnected 458 residential solar systems in ZIP code 90043 through Aug 31, 2026, 90 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Windsor Hills, Los Angeles County, as the service city on 207 of them. Sunrun has the most installs recorded in this ZIP, 90.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
458
Last 24 months
90 (Sep 2024 through Aug 2026)
Capacity
2,995.1 kW DC
Median system size
6.3 kW DC
Net Billing Tariff (NEM 3.0)
115 installs, 25.1% of those with a tariff recorded
Utility
SCE 458
First install in data
Apr 14, 2006
Latest install in data
Aug 19, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200610
200710
200800
200930
201000
201120
201270
2013130
2014180
2015280
2016360
2017331
2018160
2019202
2020252
2021327
2022437
20235713
20244324
20254543
2026 (through Aug 31, 2026)3534

Battery storage

29.0% of the residential solar installs here include battery storage across all years (133 of 458). In the last 24 months the share was 91.1% (82 of 90).

Net metering tariff

Of the 458 installs with a net metering tariff recorded: NEM 1.0 127 (27.7%), NEM 2.0 216 (47.2%), the Net Billing Tariff (often called NEM 3.0) 115 (25.1%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

41.7% of the 429 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 250 are recorded as not third-party owned. Ownership types recorded: PPA 132, lease 40, prepaid lease 1, other 6.

Installers by installs in 90043

Installers with a page in this index, most installs in this ZIP first. 139 such installers have at least one install here. 13 more installs were by 13 installer names without a page in this index. 8 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 90043Last 24 months
Sunrun9033
Tesla Energy Operations (formerly SolarCity)646
SunPower200
FREEDOM FOREVER LLC151
AMECO SOLAR LLC113
REC Solar, Inc.80
Horizon Solar Power60
LA Solar Group60
NRG Clean Power63
SOUTH WEST BUILDERS64

City and county recorded for 90043

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Windsor Hills207
City: View Park190
City: Los Angeles61
County: Los Angeles County458

Common questions

How common are home batteries with solar in 90043?

29.0% of the residential solar installs here include battery storage across all years (133 of 458). In the last 24 months the share was 91.1% (82 of 90).

How many solar installs in 90043 are under NEM 3.0?

115 of the 458 installs here with a tariff recorded (25.1%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 90043?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (90), Tesla Energy Operations (formerly SolarCity) (64), SunPower (20). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.