How many homes in ZIP code 95240 have solar?

PG&E, SCE and SDG&E interconnected 669 residential solar systems in ZIP code 95240 through Aug 31, 2026, 61 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Lodi, San Joaquin County, as the service city on 665 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 62.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
669
Last 24 months
61 (Sep 2024 through Aug 2026)
Capacity
6,495.7 kW DC
Median system size
8.8 kW DC
Net Billing Tariff (NEM 3.0)
70 installs, 10.5% of those with a tariff recorded
Utility
PGE 669
First install in data
Oct 1, 2002
Latest install in data
Aug 26, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200210
200330
200410
200510
200650
200720
200860
200960
201060
2011110
201280
2013150
2014430
2015490
2016570
2017370
2018492
2019421
2020401
2021471
2022663
2023806
20244424
20253530
2026 (through Aug 31, 2026)1510

Battery storage

11.7% of the residential solar installs here include battery storage across all years (78 of 669). In the last 24 months the share was 75.4% (46 of 61).

Net metering tariff

Of the 669 installs with a net metering tariff recorded: NEM 1.0 220 (32.9%), NEM 2.0 379 (56.7%), the Net Billing Tariff (often called NEM 3.0) 70 (10.5%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

18.8% of the 669 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 543 are recorded as not third-party owned. Ownership types recorded: PPA 97, lease 21, prepaid lease 1, other 7.

Installers by installs in 95240

Installers with a page in this index, most installs in this ZIP first. 158 such installers have at least one install here. 45 more installs were by 37 installer names without a page in this index. 42 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95240Last 24 months
Tesla Energy Operations (formerly SolarCity)623
Sunrun5016
Infinity Energy, Inc330
Momentum Solar240
Fusion Power Design181
V3 Electric146
Vivint Solar Developer, LLC130
BTA Solar120
BTA Solar Electrical Services, Inc121
SunPower100

City and county recorded for 95240

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Lodi665
County: San Joaquin County669

2 other city values on 4 installs, each under 1% of this ZIP’s installs, are not listed.

Common questions

How common are home batteries with solar in 95240?

11.7% of the residential solar installs here include battery storage across all years (78 of 669). In the last 24 months the share was 75.4% (46 of 61).

How many solar installs in 95240 are under NEM 3.0?

70 of the 669 installs here with a tariff recorded (10.5%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95240?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (62), Sunrun (50), Infinity Energy, Inc (33). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.