How many homes in ZIP code 95365 have solar?

PG&E, SCE and SDG&E interconnected 275 residential solar systems in ZIP code 95365 through Aug 31, 2026, 82 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Planada, Merced County, as the service city on 273 of them. Sunrun has the most installs recorded in this ZIP, 58.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
275
Last 24 months
82 (Sep 2024 through Aug 2026)
Capacity
1,646.4 kW DC
Median system size
5.5 kW DC
Net Billing Tariff (NEM 3.0)
107 installs, 38.9% of those with a tariff recorded
Utility
PGE 275
First install in data
Mar 2, 2011
Latest install in data
Aug 19, 2026

Installs by year

YearInstalls interconnectedWith battery storage
201110
201220
201310
201430
2015190
2016280
2017100
2018120
201940
202040
2021150
2022310
2023343
20245237
20253815
2026 (through Aug 31, 2026)215

Battery storage

21.8% of the residential solar installs here include battery storage across all years (60 of 275). In the last 24 months the share was 48.8% (40 of 82).

Net metering tariff

Of the 275 installs with a net metering tariff recorded: NEM 1.0 56 (20.4%), NEM 2.0 112 (40.7%), the Net Billing Tariff (often called NEM 3.0) 107 (38.9%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

44.4% of the 275 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 153 are recorded as not third-party owned. Ownership types recorded: PPA 87, lease 20, prepaid lease 12, other 3.

Installers by installs in 95365

Installers with a page in this index, most installs in this ZIP first. 60 such installers have at least one install here. 3 more installs were by 3 installer names without a page in this index. Counts of connected systems, not a rating.

InstallerInstalls in 95365Last 24 months
Sunrun5825
Tesla Energy Operations (formerly SolarCity)320
LIFESTYLE SOLAR INC2020
Empower Electric Solar1510
LIFESTYLE SOLAR ELECTRIC1313
SOLGEN ELECTRIC110
ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING70
GRID Alternatives71
FREEDOM FOREVER LLC61
Merced County Community Action Agency60

City and county recorded for 95365

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Planada273
County: Merced County275

1 other city value on 2 installs, each under 1% of this ZIP’s installs, are not listed.

Common questions

How common are home batteries with solar in 95365?

21.8% of the residential solar installs here include battery storage across all years (60 of 275). In the last 24 months the share was 48.8% (40 of 82).

How many solar installs in 95365 are under NEM 3.0?

107 of the 275 installs here with a tariff recorded (38.9%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95365?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (58), Tesla Energy Operations (formerly SolarCity) (32), LIFESTYLE SOLAR INC (20). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.