Merced County Community Action Agency

How many solar installs has Merced County Community Action Agency done in California, and which license number is on its installs?

Merced County Community Action Agency has 135 residential solar installs interconnected in California, active in the records from 2015 through 2025 (Apr 30, 2015 to Jun 3, 2025), most of them in Merced County (97) and Madera County (38). CSLB lists license 626272 (MERCED COUNTY COMMUNITY ACTION AGENCY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
135
Last 24 months
2
Total capacity
504.2 kW DC
Median system size
3.6 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 135 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Jun 3, 2025
Ownership types recorded
none recorded
First install
Apr 30, 2015
Latest install
Jun 3, 2025
Counties
2
Utilities
PGE 135
CSLB license
626272

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015520
2016480
2017110
201810
201900
202020
2021140
202250
202300
202400
202520
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 135 interconnected installs (1.5% of the 135 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 3, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010074.1%not counted
NEM 2.03324.4%0 (0.0%)
Net Billing Tariff21.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Merced County Community Action Agency’s installs. No residential system in the file lists a third-party owner name that matches Merced County Community Action Agency exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Merced County Community Action Agency’s 2 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Hyundai.

In the last 24 months, 2 of Merced County Community Action Agency’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai11
Mission Solar11
Inverter makerEnphase27

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 135 of 135 installs, inverters on 135. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
626272MERCED COUNTY COMMUNITY ACTION AGENCY (Corporation)CLEARB General Building ContractorAug 23, 1991Dec 31, 2027132

License numbers are the ones the utilities recorded on the interconnection applications (135 of 135 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 626272. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Merced97
Madera38

Top cities

CityInstalls
Merced53
Madera36
Atwater21
Winton11
Planada6
Livingston3
Chowchilla2
Dos Palos1
Los Banos1
Stevinson1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Merced County Community Action Agency95
MERCED COUNTY COMMUNITY ACTION AGENCY39
merced county community action agency1

Common questions

Where does Merced County Community Action Agency install solar?

Its installs are spread across 2 counties. The most are in Merced County (97 installs), followed by Madera County (38).

How often does Merced County Community Action Agency install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 2).

How many Merced County Community Action Agency installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 135 interconnected installs (1.5% of the 135 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.