Merced County Community Action
How many solar installs has Merced County Community Action done in California, and which license number is on its installs?
Merced County Community Action has 65 residential solar installs interconnected in California, active in the records from 2016 through 2018 (Sep 13, 2016 to May 31, 2018), most of them in Merced County (51) and Madera County (14). CSLB lists license 626272 (MERCED COUNTY COMMUNITY ACTION AGENCY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Dec 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to Merced County Community Action here carry more than one CSLB license number: 626272 on 42 (CSLB holder MERCED COUNTY COMMUNITY ACTION AGENCY, Merced) and 676272 on 23 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 65
- Last 24 months
- 0
- Total capacity
- 269.7 kW DC
- Median system size
- 4.2 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 65 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- First install
- Sep 13, 2016
- Latest install
- May 31, 2018
- Counties
- 2
- Utilities
- PGE 65
- CSLB license
- 626272, 676272
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2016 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2016 | 12 | 0 |
| 2017 | 38 | 0 |
| 2018 | 15 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 65 interconnected installs with a tariff recorded (65) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 12 | 18.5% | not counted |
| NEM 2.0 | 53 | 81.5% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Merced County Community Action’s installs. No residential system in the file lists a third-party owner name that matches Merced County Community Action exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 65 of Merced County Community Action’s 65 installs name a module maker in the “Generator Manufacturer” fields, and most of those (65, 100.0%) used modules recorded as SunPower.
Across all years, 65 of Merced County Community Action’s 65 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (53, 81.5%) used inverters recorded as SunPower.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SunPower | 0 | 65 |
| Inverter maker | SunPower | 0 | 53 |
| SMA | 0 | 12 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 65 of 65 installs, inverters on 65. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 626272 | MERCED COUNTY COMMUNITY ACTION AGENCY (Corporation) | CLEAR | B General Building Contractor | Aug 23, 1991 | Dec 31, 2027 | 42 |
| 676272 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 23 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (65 of 65 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 626272. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- Merced County Community Action Agency: 135 installs, license 626272
Counties
Top cities
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Merced County Community Action | 60 |
| MERCED COUNTY COMMUNITY ACTION | 5 |
Common questions
Where does Merced County Community Action install solar?
Its installs are spread across 2 counties. The most are in Merced County (51 installs), followed by Madera County (14).
How often does Merced County Community Action install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Merced County Community Action installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 65 interconnected installs with a tariff recorded (65) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.