All Seasons Energy Solutions

How many solar installs has All Seasons Energy Solutions done in California, and which license number is on its installs?

All Seasons Energy Solutions has 258 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Feb 4, 2011 to Jul 15, 2026), most of them in Kern County (248), Fresno County (3) and Ventura County (3). CSLB lists license 949411 (ALL SEASONS ENERGY SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
258
Last 24 months
24
Total capacity
1,898.8 kW DC
Median system size
6.5 kW DC
With battery storage
2.7% all time; 12.5% last 24 months
Third-party owned
0.8% of 258 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
33 installs, latest Jul 15, 2026
Ownership types recorded
PPA 2
Median battery size
10.1 kWh (2 installs list a capacity)
First install
Feb 4, 2011
Latest install
Jul 15, 2026
Counties
5
Utilities
PGE 248, SCE 10
CSLB license
949411

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201130
201280
2013130
2014190
2015130
201600
201700
201800
201970
2020401
2021431
2022361
2023430
2024131
2025132
2026 (through Aug 31, 2026)71

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

33 of its 258 interconnected installs (12.8% of the 258 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 12.1% of those include battery storage. The latest Net Billing Tariff install was approved Jul 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05621.7%not counted
NEM 2.016965.5%3 (1.8%)
Net Billing Tariff3312.8%4 (12.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of All Seasons Energy Solutions’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches All Seasons Energy Solutions exactly.

Third-party owner named on its installsInstalls
Sunnova2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 24 of All Seasons Energy Solutions’ 24 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (12, 50.0%) used modules recorded as Qcells.

In the last 24 months, 24 of All Seasons Energy Solutions’ 24 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (24, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 3 of All Seasons Energy Solutions’ 24 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as Enphase.

7 of 7 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1235
United Renewable Energy434
JA Solar2not in top list
JinkoSolar2not in top list
Axitec1not in top list
Inverter makerEnphase24237
Battery makerEnphase36

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 247 of 258 installs, inverters on 258. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names All Seasons Energy Solutions as developer on 4 battery storage projects and as installer on 3 (3 name it as both), 4 projects in all with 38 kWh of storage. 2 have the status Paid, with $11,444 in current incentive allocations. Applications were received from Oct 21, 2021 to Jan 18, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid219$11,444
Cancelled110$9,127
RRF Rejected18$1,259

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency110$9,7061$9,706
Large-Scale Storage110$9,1270$0
Small Residential Storage110$1,7381$1,738
Not stated18$1,2590$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
949411ALL SEASONS ENERGY SOLUTIONS (Corporation)CLEARB General Building ContractorJun 28, 2010Jun 30, 2028234

License numbers are the ones the utilities recorded on the interconnection applications (234 of 258 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 949411. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Kern248
Fresno3
Ventura3
Los Angeles2
San Luis Obispo2

Top cities

CityInstalls
Bakersfield233
Shafter8
Delano3
Arroyo Grande2
Fresno2
Mcfarland2
Simi Valley2
Wasco2
Newhall1
Rowland Heights1
Sanger1
Santa Paula1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALL SEASONS ENERGY SOLUTIONS203
All Seasons Energy Solutions35
All Seasons Energy Solutions dba All Sea17
All seasons Energy Solutions2
All Seasons Energy solutions1

Common questions

Where does All Seasons Energy Solutions install solar?

Its installs are spread across 5 counties. The most are in Kern County (248 installs), followed by Fresno County (3).

How often does All Seasons Energy Solutions install batteries with solar?

2.7% of its interconnected solar installs include battery storage across all years, and 12.5% in the last 24 months (3 of 24).

How many All Seasons Energy Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

33 of its 258 interconnected installs (12.8% of the 258 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 12.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.