BRIGHTEN SOLAR CO

How many solar installs has BRIGHTEN SOLAR CO done in California, and which license number is on its installs?

BRIGHTEN SOLAR CO has 115 residential solar installs interconnected in California, active in the records from 2017 through 2019 (Jan 26, 2017 to Dec 31, 2019), most of them in Santa Barbara County (109) and Ventura County (6). CSLB lists license 1009246 (BRIGHTEN SOLAR CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
115
Last 24 months
0
Total capacity
581.7 kW DC
Median system size
4.2 kW DC
With battery storage
5.2% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 115 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
7.9 kWh (6 installs list a capacity)
First install
Jan 26, 2017
Latest install
Dec 31, 2019
Counties
2
Utilities
SCE 111, PGE 4
CSLB license
1009246

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201740
2018474
2019642
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 115 interconnected installs with a tariff recorded (115) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.043.5%not counted
NEM 2.011196.5%6 (5.4%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on BRIGHTEN SOLAR CO’s installs. No residential system in the file lists a third-party owner name that matches BRIGHTEN SOLAR CO exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 114 of BRIGHTEN SOLAR CO’s 115 installs name a module maker in the “Generator Manufacturer” fields, and most of those (82, 71.9%) used modules recorded as LG.

Across all years, 115 of BRIGHTEN SOLAR CO’s 115 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (80, 69.6%) used inverters recorded as SolarEdge.

Across all years, 6 of BRIGHTEN SOLAR CO’s 115 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used batteries recorded as sonnen.

6 of 6 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG082
Panasonic027
Silfab03
Lumos01
SunPower01
Inverter makerSolarEdge080
Enphase034
Schuco USA01
SMA01
SunPower01
Battery makersonnen04
LG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 114 of 115 installs, inverters on 115. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names BRIGHTEN SOLAR CO as developer on 0 battery storage projects and as installer on 10 (0 name it as both), 10 projects in all with 104 kWh of storage. 1 have the status Paid, with $1,428 in current incentive allocations. Applications were received from Oct 22, 2020 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid110$1,428
Reserved332$4,817
Pending Reservation219$2,909
Cancelled443$15,624

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage880$12,5011$1,428
Equity Resiliency110$9,7060$0
Large-Scale Storage114$2,5700$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1009246BRIGHTEN SOLAR CONSTRUCTION (Limited Liability)CLEARB General Building Contractor; C-10 Electrical ContractorNov 25, 2015Nov 30, 2027114

License numbers are the ones the utilities recorded on the interconnection applications (115 of 115 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1009246. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Barbara109
Ventura6

Top cities

CityInstalls
Santa Barbara78
Goleta22
Ventura6
Carpinteria4
Santa Ynez3
Solvang1
Summerland1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRIGHTEN SOLAR CO92
BRIGHTEN SOLAR CO.10
Brighten Solar Co.8
Brighten Solar Co5

Common questions

Where does BRIGHTEN SOLAR CO install solar?

Its installs are spread across 2 counties. The most are in Santa Barbara County (109 installs), followed by Ventura County (6).

How often does BRIGHTEN SOLAR CO install batteries with solar?

5.2% of its interconnected solar installs include battery storage across all years.

How many BRIGHTEN SOLAR CO installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 115 interconnected installs with a tariff recorded (115) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.