Cal Paso Solar Electric

How many solar installs has Cal Paso Solar Electric done in California, and which license number is on its installs?

Cal Paso Solar Electric has 155 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Feb 1, 2010 to Jan 22, 2026), most of them in San Luis Obispo County (147), Monterey County (4) and Los Angeles County (2). CSLB lists license 933700 (CAL PASO SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
155
Last 24 months
6
Total capacity
1,376.1 kW DC
Median system size
7.2 kW DC
With battery storage
11.0% all time; 33.3% last 24 months
Third-party owned
0.0% of 155 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jun 9, 2025
Ownership types recorded
none recorded
Median battery size
9600 kWh (17 installs list a capacity)
First install
Feb 1, 2010
Latest install
Jan 22, 2026
Counties
4
Utilities
PGE 153, SCE 2
CSLB license
933700

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201030
201120
2012110
201360
201460
2015160
2016140
2017210
2018110
201950
202090
202170
2022134
2023177
202495
202541
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 155 interconnected installs (0.6% of the 155 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 9, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05938.1%not counted
NEM 2.09561.3%16 (16.8%)
Net Billing Tariff10.6%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Cal Paso Solar Electric’s installs. No residential system in the file lists a third-party owner name that matches Cal Paso Solar Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Cal Paso Solar Electric’s 6 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 50.0%) used modules recorded as United Renewable Energy.

In the last 24 months, 6 of Cal Paso Solar Electric’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 66.7%) used inverters recorded as SolarEdge.

In the last 24 months, 2 of Cal Paso Solar Electric’s 6 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Stored Energy Inc.

11 of 17 battery-paired PG&E and SCE installs (64.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnited Renewable Energy312
JinkoSolar19
Qcells110
REC18
Inverter makerSolarEdge490
Sol-Ark218
Battery makerStored Energy Inc28

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 138 of 155 installs, inverters on 155. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
933700CAL PASO SOLAR ELECTRIC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJun 10, 2009Jun 30, 2027132

License numbers are the ones the utilities recorded on the interconnection applications (132 of 155 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 933700. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Luis Obispo147
Monterey4
Los Angeles2
Santa Barbara2

Top cities

CityInstalls
Paso Robles79
Atascadero14
Templeton14
Creston12
San Luis Obispo10
San Miguel9
Santa Margarita3
Morro Bay2
Nipomo2
Parkfield2
Santa Maria2
Westlake Village2
Avila Beach1
Bradley1
Lockwood1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CAL PASO SOLAR ELECTRIC112
Cal Paso Solar Electric43

Common questions

Where does Cal Paso Solar Electric install solar?

Its installs are spread across 4 counties. The most are in San Luis Obispo County (147 installs), followed by Monterey County (4).

How often does Cal Paso Solar Electric install batteries with solar?

11.0% of its interconnected solar installs include battery storage across all years, and 33.3% in the last 24 months (2 of 6).

How many Cal Paso Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 155 interconnected installs (0.6% of the 155 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.