Carnahan Electric, Ltd.

How many solar installs has Carnahan Electric, Ltd. done in California, and which license number is on its installs?

Carnahan Electric, Ltd. has 54 residential solar installs interconnected in California, active in the records from 2003 through 2018 (Jul 9, 2003 to Nov 21, 2018), most of them in El Dorado County (53) and Amador County (1). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
54
Last 24 months
0
Total capacity
330.2 kW DC
Median system size
5.9 kW DC
With battery storage
3.7% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 54 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 9, 2003
Latest install
Nov 21, 2018
Counties
2
Utilities
PGE 54
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200320
200420
200500
200630
200700
200800
200970
2010180
201170
201260
201300
201422
201510
201620
201700
201840
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05092.6%not counted
NEM 2.047.4%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Carnahan Electric, Ltd.’s installs. No residential system in the file lists a third-party owner name that matches Carnahan Electric, Ltd. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 53 of Carnahan Electric, Ltd.’s 54 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14, 26.4%) used modules recorded as Sharp.

Across all years, 54 of Carnahan Electric, Ltd.’s 54 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (21, 38.9%) used inverters recorded as Enphase.

0 of 2 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSharp014
SunPower013
BP Solar07
SolarWorld07
Astro Power, Inc02
Inverter makerEnphase021
SMA012
SunPower011
Fronius04
OutBack Power03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 53 of 54 installs, inverters on 54. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (7 of 54 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
El Dorado53
Amador1

Top cities

CityInstalls
Placerville18
Shingle Springs10
Somerset6
Rescue5
El Dorado4
Cameron Park1
Camino1
Diamond Springs1
Garden Valley1
Georgetown1
Grizzly Flats1
Kyburz1
Lotus1
Mount Aukum1
Plymouth1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Carnahan Electric, Ltd.28
Carnahan Electric Ltd11
Carnahan Electric Ltd.7
Carnahan Electric3
Carnahan Electric LTD2
Carnahan Electric, Ltd2
CARNAHAN ELECTRIC1

Common questions

Where does Carnahan Electric, Ltd. install solar?

Its installs are spread across 2 counties. The most are in El Dorado County (53 installs), followed by Amador County (1).

How often does Carnahan Electric, Ltd. install batteries with solar?

3.7% of its interconnected solar installs include battery storage across all years.

How many Carnahan Electric, Ltd. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.