How many solar installs has CLEAR EFFICIENCY HOME IMPROVEMENT done in California, and which license number is on its installs?
CLEAR EFFICIENCY HOME IMPROVEMENT has 41 residential solar installs interconnected in California, active in the records from 2023 through 2025 (Apr 19, 2023 to Jan 9, 2025), most of them in Placer County (18), El Dorado County (10) and Solano County (4). CSLB lists license 1055155 (CLEAR EFFICIENCY HOME IMPROVEMENT) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-20, expires Jun 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 41
- Last 24 months
- 1
- Total capacity
- 347.1 kW DC
- Median system size
- 7.8 kW DC
- With battery storage
- 4.9% all time; 0.0% last 24 months
- Third-party owned
- 0.0% of 41 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 1 installs, latest Dec 18, 2023
- Ownership types recorded
- none recorded
- First install
- Apr 19, 2023
- Latest install
- Jan 9, 2025
- Counties
- 9
- Utilities
- PGE 41
- CSLB license
- 1055155
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2023 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2023 | 38 | 2 |
| 2024 | 2 | 0 |
| 2025 | 1 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
1 of its 41 interconnected installs (2.4% of the 41 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 18, 2023.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 40 | 97.6% | 2 (5.0%) |
| Net Billing Tariff | 1 | 2.4% | 0 (0.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on CLEAR EFFICIENCY HOME IMPROVEMENT’s installs. No residential system in the file lists a third-party owner name that matches CLEAR EFFICIENCY HOME IMPROVEMENT exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 1 of CLEAR EFFICIENCY HOME IMPROVEMENT’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as REC.
In the last 24 months, 1 of CLEAR EFFICIENCY HOME IMPROVEMENT’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.
In the last 24 months, none of CLEAR EFFICIENCY HOME IMPROVEMENT’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.
2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 1 | 20 |
| Inverter maker | Enphase | 1 | 41 |
| Battery maker | Enphase | 0 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 34 of 41 installs, inverters on 41. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1055155 | CLEAR EFFICIENCY HOME IMPROVEMENT (Corporation) | CLEAR, Pending IFS | B General Building Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor | Jun 25, 2019 | Jun 30, 2027 | 41 |
License numbers are the ones the utilities recorded on the interconnection applications (41 of 41 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The License Master file lists a pending suspension date of Jan 24, 2027 for license 1055155. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Counties
Top cities
| City | Installs |
|---|---|
| Rocklin | 8 |
| Auburn | 5 |
| El Dorado Hills | 5 |
| Granite Bay | 2 |
| Lincoln | 2 |
| Placerville | 2 |
| Suisun City | 2 |
| Woodland | 2 |
| Cameron Park | 1 |
| Colusa | 1 |
| Dixon | 1 |
| Grass Valley | 1 |
| Grizzly Flats | 1 |
| Loomis | 1 |
| Plumas Lake | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| CLEAR EFFICIENCY HOME IMPROVEMENT | 41 |
Common questions
Where does CLEAR EFFICIENCY HOME IMPROVEMENT install solar?
Its installs are spread across 9 counties. The most are in Placer County (18 installs), followed by El Dorado County (10).
How often does CLEAR EFFICIENCY HOME IMPROVEMENT install batteries with solar?
4.9% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).
How many CLEAR EFFICIENCY HOME IMPROVEMENT installs are under NEM 3.0 (the Net Billing Tariff)?
1 of its 41 interconnected installs (2.4% of the 41 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.