How many solar installs has CONCEPTIONAL ELECTRIC done in California, and which license number is on its installs?

CONCEPTIONAL ELECTRIC has 54 residential solar installs interconnected in California, active in the records from 2019 through 2022 (Nov 14, 2019 to May 26, 2022), most of them in Humboldt County (54). CSLB lists license 994153 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
54
Last 24 months
0
Total capacity
325.3 kW DC
Median system size
5.5 kW DC
With battery storage
46.3% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 54 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
10.1 kWh (25 installs list a capacity)
First install
Nov 14, 2019
Latest install
May 26, 2022
Counties
1
Utilities
PGE 54
CSLB license
994153

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201960
20202715
2021178
202242
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.054100.0%25 (46.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CONCEPTIONAL ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches CONCEPTIONAL ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 53 of CONCEPTIONAL ELECTRIC’s 54 installs name a module maker in the “Generator Manufacturer” fields, and most of those (28, 52.8%) used modules recorded as Qcells.

Across all years, 54 of CONCEPTIONAL ELECTRIC’s 54 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (27, 50.0%) used inverters recorded as Generac.

Across all years, 16 of CONCEPTIONAL ELECTRIC’s 54 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (16, 100.0%) used batteries recorded as Generac.

16 of 25 battery-paired PG&E and SCE installs (64.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells028
JinkoSolar011
Pika Energy08
Trina Solar07
Heliene03
Inverter makerGenerac027
Pika Energy014
SMA08
SolarEdge05
Battery makerGenerac016

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 53 of 54 installs, inverters on 54. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CONCEPTIONAL ELECTRIC as developer on 0 battery storage projects and as installer on 7 (0 name it as both), 7 projects in all with 66 kWh of storage. 7 have the status Paid, with $13,056 in current incentive allocations. Applications were received from Dec 3, 2020 to Mar 10, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid766$13,056

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage766$13,0567$13,056

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
994153Sole owner license (name not shown)CLEARC-10 Electrical ContractorJun 28, 2014Jun 30, 202854

License numbers are the ones the utilities recorded on the interconnection applications (54 of 54 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 994153. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Humboldt54

Top cities

CityInstalls
Eureka26
Arcata9
Fortuna6
Mckinleyville4
Bayside3
Hydesville2
Blue Lake1
Carlotta1
Ferndale1
Trinidad1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CONCEPTIONAL ELECTRIC54

Common questions

Where does CONCEPTIONAL ELECTRIC install solar?

Its installs are spread across 1 county. The most are in Humboldt County (54 installs).

How often does CONCEPTIONAL ELECTRIC install batteries with solar?

46.3% of its interconnected solar installs include battery storage across all years.

How many CONCEPTIONAL ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.