FIRST RESPONSE SOLAR INC

How many solar installs has FIRST RESPONSE SOLAR INC done in California, and which license number is on its installs?

FIRST RESPONSE SOLAR INC has 315 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Aug 11, 2020 to Aug 26, 2026), most of them in Sonoma County (310) and Napa County (5). CSLB lists license 1039876 (FIRST RESPONSE SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
315
Last 24 months
41
Total capacity
2,655.5 kW DC
Median system size
7.6 kW DC
With battery storage
25.1% all time; 61.0% last 24 months
Third-party owned
0.3% of 315 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
52 installs, latest Jul 24, 2026
Ownership types recorded
prepaid lease 1
Median battery size
14 kWh (11 installs list a capacity)
First install
Aug 11, 2020
Latest install
Aug 26, 2026
Counties
2
Utilities
PGE 315
CSLB license
1039876

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
20202311
2021569
2022595
20239010
20245624
20252112
2026 (through Aug 31, 2026)108

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

52 of its 315 interconnected installs (16.5% of the 315 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.8% of those include battery storage. The latest Net Billing Tariff install was approved Jul 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.061.9%not counted
NEM 2.025781.6%32 (12.5%)
Net Billing Tariff5216.5%42 (80.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of FIRST RESPONSE SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches FIRST RESPONSE SOLAR INC exactly.

Third-party owner named on its installsInstalls
HDM1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 32 of FIRST RESPONSE SOLAR INC’s 41 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 46.9%) used modules recorded as Mission Solar.

In the last 24 months, 41 of FIRST RESPONSE SOLAR INC’s 41 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (30, 73.2%) used inverters recorded as Enphase.

In the last 24 months, 17 of FIRST RESPONSE SOLAR INC’s 41 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (8, 47.1%) used batteries recorded as Tesla.

64 of 79 battery-paired PG&E and SCE installs (81.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar15154
REC1370
Canadian Solar22
BP Solar1not in top list
LG112
Inverter makerEnphase30304
Tesla1111
SMA815
FranklinWH55
Fronius24
Battery makerTesla88
Enphase552
FranklinWH44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 276 of 315 installs, inverters on 315. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names FIRST RESPONSE SOLAR INC as developer on 23 battery storage projects and as installer on 23 (23 name it as both), 23 projects in all with 370 kWh of storage. 19 have the status Paid, with $125,529 in current incentive allocations. Applications were received from Jul 11, 2020 to Jan 8, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid19286$125,529
Reserved113$23,525
Cancelled370$33,593

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage14175$30,90813$29,480
Equity Resiliency5101$101,4414$78,794
Large-Scale Storage267$15,9241$6,406
Residential Solar and Storage Equity - AB 209 Non-POU113$23,5250$0
Residential Solar and Storage Equity - Ratepayer113$10,8491$10,849

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1039876FIRST RESPONSE SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMay 29, 2018May 31, 2028315

License numbers are the ones the utilities recorded on the interconnection applications (315 of 315 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1039876. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Sonoma310
Napa5

Top cities

CityInstalls
Santa Rosa139
Sebastopol71
Sonoma23
Petaluma17
Forestville12
Cloverdale10
Windsor10
Bodega Bay7
Glen Ellen3
Kenwood3
Penngrove3
Calistoga2
Cotati2
Guerneville2
Occidental2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FIRST RESPONSE SOLAR INC311
First Response Solar2
First Response Solar Inc.2

Common questions

Where does FIRST RESPONSE SOLAR INC install solar?

Its installs are spread across 2 counties. The most are in Sonoma County (310 installs), followed by Napa County (5).

How often does FIRST RESPONSE SOLAR INC install batteries with solar?

25.1% of its interconnected solar installs include battery storage across all years, and 61.0% in the last 24 months (25 of 41).

How many FIRST RESPONSE SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

52 of its 315 interconnected installs (16.5% of the 315 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.