Global HVAC and Construction

How many solar installs has Global HVAC and Construction done in California, and which license number is on its installs?

Global HVAC and Construction has 44 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Feb 14, 2014 to Mar 25, 2026), most of them in Solano County (31), Yolo County (7) and Contra Costa County (2). CSLB lists license 762256 (GLOBAL HVAC AND CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-20, C-36, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
44
Last 24 months
6
Total capacity
343.9 kW DC
Median system size
6.1 kW DC
With battery storage
4.5% all time; 16.7% last 24 months
Third-party owned
0.0% of 44 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Mar 25, 2026
Ownership types recorded
none recorded
First install
Feb 14, 2014
Latest install
Mar 25, 2026
Counties
6
Utilities
PGE 44
CSLB license
762256

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014140
201560
201610
201730
201830
201950
202020
202110
202200
202331
202400
202541
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 44 interconnected installs (11.4% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 20.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02250.0%not counted
NEM 2.01738.6%1 (5.9%)
Net Billing Tariff511.4%1 (20.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Global HVAC and Construction’s installs. No residential system in the file lists a third-party owner name that matches Global HVAC and Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Global HVAC and Construction’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 100.0%) used modules recorded as Znshine.

In the last 24 months, 6 of Global HVAC and Construction’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Global HVAC and Construction’s 6 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine67
Inverter makerEnphase644
Battery makerEnphase12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 44 of 44 installs, inverters on 44. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
762256GLOBAL HVAC AND CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36Apr 27, 1999Jun 30, 202843

License numbers are the ones the utilities recorded on the interconnection applications (43 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 762256. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Solano31
Yolo7
Contra Costa2
Napa2
Fresno1
Shasta1

Top cities

CityInstalls
Vacaville24
Winters4
Davis3
Fairfield2
Napa2
Suisun City2
Alamo1
Anderson1
Benicia1
Dixon1
Fresno1
Richmond1
Rio Vista1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Global HVAC and Construction23
GLOBAL HVAC AND CONSTRUCTION14
Global HVAC & Construction4
global hvac and construction3

Common questions

Where does Global HVAC and Construction install solar?

Its installs are spread across 6 counties. The most are in Solano County (31 installs), followed by Yolo County (7).

How often does Global HVAC and Construction install batteries with solar?

4.5% of its interconnected solar installs include battery storage across all years, and 16.7% in the last 24 months (1 of 6).

How many Global HVAC and Construction installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 44 interconnected installs (11.4% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 20.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.