Greiner Heating Air Solar Energy Inc has 199 residential solar installs interconnected in California, active in the records from 2018 through 2025 (Jan 4, 2018 to Aug 8, 2025), most of them in Solano County (101) and Yolo County (98). CSLB lists license 365955 (GREINER HEATING AIR AND ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-2, C-10, C-20, C-36, C-46, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
199
Last 24 months
10
Total capacity
1,241 kW DC
Median system size
6 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 199 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jun 4, 2025
Ownership types recorded
none recorded
First install
Jan 4, 2018
Latest install
Aug 8, 2025
Counties
2
Utilities
PGE 199
CSLB license
365955

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018110
201950
2020150
2021290
2022340
2023880
2024120
202550
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 199 interconnected installs (0.5% of the 199 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 4, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.5%not counted
NEM 2.019799.0%0 (0.0%)
Net Billing Tariff10.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Greiner Heating Air Solar Energy Inc’s installs. No residential system in the file lists a third-party owner name that matches Greiner Heating Air Solar Energy Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of Greiner Heating Air Solar Energy Inc’s 10 installs name a module maker in the “Generator Manufacturer” fields, and most of those (9, 100.0%) used modules recorded as Waaree.

In the last 24 months, 10 of Greiner Heating Air Solar Energy Inc’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (10, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerWaaree951
Inverter makerEnphase10199
SunPower110

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 166 of 199 installs, inverters on 199. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
365955GREINER HEATING AIR AND ELECTRIC INC (Corporation)CLEARC-2; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-46 Solar ContractorNov 20, 1978May 31, 2028199

License numbers are the ones the utilities recorded on the interconnection applications (199 of 199 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 365955. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Solano101
Yolo98

Top cities

CityInstalls
Davis56
Vacaville46
Woodland27
Fairfield24
Dixon22
West Sacramento9
Suisun City8
Winters7

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREINER HEATING - AIR - SOLAR ENERGY INC156
Greiner Heating Air Solar Energy Inc43

Common questions

Where does Greiner Heating Air Solar Energy Inc install solar?

Its installs are spread across 2 counties. The most are in Solano County (101 installs), followed by Yolo County (98).

How often does Greiner Heating Air Solar Energy Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 10).

How many Greiner Heating Air Solar Energy Inc installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 199 interconnected installs (0.5% of the 199 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.