INVERTED ELECTRIC

How many solar installs has INVERTED ELECTRIC done in California, and which license number is on its installs?

INVERTED ELECTRIC has 34 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Feb 27, 2024 to Jul 15, 2026), most of them in Nevada County (30), Placer County (2) and Contra Costa County (1). CSLB lists license 1111808 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
34
Last 24 months
29
Total capacity
261.2 kW DC
Median system size
7.5 kW DC
With battery storage
94.1% all time; 96.6% last 24 months
Third-party owned
0.0% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
34 installs, latest Jul 15, 2026
Ownership types recorded
none recorded
Median battery size
14 kWh (13 installs list a capacity)
First install
Feb 27, 2024
Latest install
Jul 15, 2026
Counties
4
Utilities
PGE 34
CSLB license
1111808

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202476
20251615
2026 (through Aug 31, 2026)1111

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

34 of its 34 interconnected installs (100.0% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.1% of those include battery storage. The latest Net Billing Tariff install was approved Jul 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff34100.0%32 (94.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on INVERTED ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches INVERTED ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 27 of INVERTED ELECTRIC’s 29 installs name a module maker in the “Generator Manufacturer” fields, and most of those (18, 66.7%) used modules recorded as CertainTeed.

In the last 24 months, 29 of INVERTED ELECTRIC’s 29 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (27, 93.1%) used inverters recorded as Tesla.

In the last 24 months, 22 of INVERTED ELECTRIC’s 29 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (13, 59.1%) used batteries recorded as FranklinWH.

26 of 32 battery-paired PG&E and SCE installs (81.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed1823
Silfab88
Evergreen Solar11
REC11
Inverter makerTesla2729
FranklinWH1313
Enphase36
SMA22
Sol-Ark11
Battery makerFranklinWH1313
Tesla810
Enphase13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 32 of 34 installs, inverters on 34. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names INVERTED ELECTRIC as developer on 3 battery storage projects and as installer on 3 (3 name it as both), 3 projects in all with 43 kWh of storage. 1 have the status Paid, with $13,200 in current incentive allocations. Applications were received from Jun 19, 2025 to Nov 14, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid113$13,200
Cancelled230$46,715

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU230$46,7150$0
Equity Resiliency113$13,2001$13,200

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1111808Sole owner license (name not shown)CLEARC-10 Electrical ContractorOct 24, 2023Oct 31, 202734

License numbers are the ones the utilities recorded on the interconnection applications (34 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1111808. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Nevada30
Placer2
Contra Costa1
Yuba1

Top cities

CityInstalls
Grass Valley14
Nevada City11
Penn Valley4
Byron1
Colfax1
Newcastle1
North San Juan1
Smartsville1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
INVERTED ELECTRIC34

Common questions

Where does INVERTED ELECTRIC install solar?

Its installs are spread across 4 counties. The most are in Nevada County (30 installs), followed by Placer County (2).

How often does INVERTED ELECTRIC install batteries with solar?

94.1% of its interconnected solar installs include battery storage across all years, and 96.6% in the last 24 months (28 of 29).

How many INVERTED ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

34 of its 34 interconnected installs (100.0% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.