JBL Solar Energy
How many solar installs has JBL Solar Energy done in California, and which license number is on its installs?
JBL Solar Energy has 75 residential solar installs interconnected in California, active in the records from 2013 through 2024 (Jun 14, 2013 to Apr 4, 2024), most of them in Sonoma County (55), Marin County (14) and Napa County (4). CSLB lists license 981865 (OCAL) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Sep 30, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 75
- Last 24 months
- 0
- Total capacity
- 429.3 kW DC
- Median system size
- 5.5 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 75 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- First install
- Jun 14, 2013
- Latest install
- Apr 4, 2024
- Counties
- 4
- Utilities
- PGE 75
- CSLB license
- 981865
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2013 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2013 | 2 | 0 |
| 2014 | 10 | 0 |
| 2015 | 18 | 0 |
| 2016 | 19 | 0 |
| 2017 | 8 | 0 |
| 2018 | 7 | 0 |
| 2019 | 9 | 0 |
| 2020 | 1 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 1 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 75 interconnected installs with a tariff recorded (75) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 49 | 65.3% | not counted |
| NEM 2.0 | 26 | 34.7% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on JBL Solar Energy’s installs. No residential system in the file lists a third-party owner name that matches JBL Solar Energy exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 75 of JBL Solar Energy’s 75 installs name a module maker in the “Generator Manufacturer” fields, and most of those (43, 57.3%) used modules recorded as SolarWorld.
Across all years, 75 of JBL Solar Energy’s 75 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (27, 36.0%) used inverters recorded as SolarEdge.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SolarWorld | 0 | 43 |
| Canadian Solar | 0 | 16 | |
| LG | 0 | 4 | |
| Mission Solar | 0 | 4 | |
| Qcells | 0 | 2 | |
| Inverter maker | SolarEdge | 0 | 27 |
| Enphase | 0 | 26 | |
| SMA | 0 | 22 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 75 of 75 installs, inverters on 75. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names JBL Solar Energy as developer on 9 battery storage projects and as installer on 10 (9 name it as both), 10 projects in all with 140 kWh of storage. 8 have the status Paid, with $29,520 in current incentive allocations. Applications were received from Jul 5, 2019 to Nov 6, 2023.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 8 | 98 | $29,520 |
| Cancelled | 2 | 42 | $35,715 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 8 | 89 | $14,810 | 7 | $12,712 |
| Equity Resiliency | 2 | 51 | $50,424 | 1 | $16,808 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 981865 | OCAL (Corporation) | CLEAR, Pending Case/CIT| DISC Bond Filed | B General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar Contractor | Mar 9, 2013 | Sep 30, 2028 | 71 |
License numbers are the ones the utilities recorded on the interconnection applications (71 of 75 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
CSLB’s License Master file lists a disciplinary bond on license 981865 (bond reason recorded: Conditional), required Dec 2, 2025, $30,000, CSLB case number 2024000135, no cancellation date recorded. CSLB lists license 981865 under the business name OCAL; the bond is on the license, as CSLB records it. Current CSLB record: 981865.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Local solar permits naming its license
Solar permits in city and county open data that list JBL Solar Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | Total |
|---|---|---|---|
| unincorporated Marin County | 981865 | 2 | 2 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- OCAL: 64 installs, license 981865
Counties
Top cities
| City | Installs |
|---|---|
| Santa Rosa | 20 |
| Sebastopol | 6 |
| Cloverdale | 5 |
| Novato | 5 |
| Petaluma | 5 |
| Sonoma | 3 |
| Windsor | 3 |
| Forestville | 2 |
| Healdsburg | 2 |
| Mill Valley | 2 |
| Penngrove | 2 |
| San Rafael | 2 |
| Sausalito | 2 |
| Tiburon | 2 |
| American Canyon | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| JBL SOLAR ENERGY | 61 |
| JBL Solar Energy | 13 |
| JBL SOLAR ENERGY INC. DBA OCAL | 1 |
Common questions
Where does JBL Solar Energy install solar?
Its installs are spread across 4 counties. The most are in Sonoma County (55 installs), followed by Marin County (14).
How often does JBL Solar Energy install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many JBL Solar Energy installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 75 interconnected installs with a tariff recorded (75) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.