JSB SOLAR SOLUTIONS INC
How many solar installs has JSB SOLAR SOLUTIONS INC done in California, and which license number is on its installs?
JSB SOLAR SOLUTIONS INC has 64 residential solar installs interconnected in California, active in the records from 2018 through 2021 (Feb 22, 2018 to Apr 15, 2021), most of them in Santa Barbara County (63) and Ventura County (1). CSLB lists license 951713 (ACTION ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Aug 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 64
- Last 24 months
- 0
- Total capacity
- 359 kW DC
- Median system size
- 5 kW DC
- With battery storage
- 32.8% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 64 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- Median battery size
- 11.4 kWh (21 installs list a capacity)
- First install
- Feb 22, 2018
- Latest install
- Apr 15, 2021
- Counties
- 2
- Utilities
- SCE 64
- CSLB license
- 951713
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2018 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2018 | 7 | 1 |
| 2019 | 8 | 1 |
| 2020 | 40 | 16 |
| 2021 | 9 | 3 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 64 interconnected installs with a tariff recorded (64) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 64 | 100.0% | 21 (32.8%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on JSB SOLAR SOLUTIONS INC’s installs. No residential system in the file lists a third-party owner name that matches JSB SOLAR SOLUTIONS INC exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 64 of JSB SOLAR SOLUTIONS INC’s 64 installs name a module maker in the “Generator Manufacturer” fields, and most of those (62, 96.9%) used modules recorded as LG.
Across all years, 64 of JSB SOLAR SOLUTIONS INC’s 64 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (42, 65.6%) used inverters recorded as SolarEdge.
Across all years, 16 of JSB SOLAR SOLUTIONS INC’s 64 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 56.3%) used batteries recorded as LG.
16 of 21 battery-paired PG&E and SCE installs (76.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | LG | 0 | 62 |
| Pika | 0 | 2 | |
| Simpliphi | 0 | 2 | |
| SolArc | 0 | 1 | |
| SolarWorld | 0 | 1 | |
| Inverter maker | SolarEdge | 0 | 42 |
| Generac | 0 | 6 | |
| LG | 0 | 6 | |
| Sol-Ark | 0 | 4 | |
| SunPower | 0 | 3 | |
| Battery maker | LG | 0 | 9 |
| Generac | 0 | 6 | |
| Tesla | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 64 of 64 installs, inverters on 64. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names JSB SOLAR SOLUTIONS INC as developer on 1 battery storage project and as installer on 0 (0 name it as both), 1 projects in all with 8 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Sep 28, 2020 to Sep 28, 2020.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Cancelled | 1 | 8 | $8,320 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Equity Resiliency | 1 | 8 | $8,320 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 951713 | ACTION ENERGY (Corporation) | CLEAR | B General Building Contractor | Aug 30, 2010 | Aug 31, 2028 | 64 |
License numbers are the ones the utilities recorded on the interconnection applications (64 of 64 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 951713. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- Action Energy: 311 installs, license 951713
Counties
| County | Installs |
|---|---|
| Santa Barbara | 63 |
| Ventura | 1 |
Top cities
| City | Installs |
|---|---|
| Santa Barbara | 57 |
| Goleta | 4 |
| Carpinteria | 1 |
| Ojai | 1 |
| Summerland | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| JSB SOLAR SOLUTIONS INC | 64 |
Common questions
Where does JSB SOLAR SOLUTIONS INC install solar?
Its installs are spread across 2 counties. The most are in Santa Barbara County (63 installs), followed by Ventura County (1).
How often does JSB SOLAR SOLUTIONS INC install batteries with solar?
32.8% of its interconnected solar installs include battery storage across all years.
How many JSB SOLAR SOLUTIONS INC installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 64 interconnected installs with a tariff recorded (64) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.