M D ELECTRIC & SOLAR INC

How many solar installs has M D ELECTRIC & SOLAR INC done in California, and which license number is on its installs?

M D ELECTRIC & SOLAR INC has 181 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 10, 2019 to Aug 24, 2026), most of them in Sonoma County (132) and Mendocino County (49). CSLB lists license 815891 (M D ELECTRIC & SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
181
Last 24 months
60
Total capacity
1,203.9 kW DC
Median system size
6.3 kW DC
With battery storage
54.7% all time; 83.3% last 24 months
Third-party owned
0.0% of 181 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
62 installs, latest Aug 24, 2026
Ownership types recorded
none recorded
Median battery size
18.5 kWh (97 installs list a capacity)
First install
Oct 10, 2019
Latest install
Aug 24, 2026
Counties
2
Utilities
PGE 181
CSLB license
815891

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201950
202091
2021156
20222918
20234814
20243121
20253429
2026 (through Aug 31, 2026)1010

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

62 of its 181 interconnected installs (34.3% of the 181 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011965.7%41 (34.5%)
Net Billing Tariff6234.3%58 (93.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on M D ELECTRIC & SOLAR INC’s installs. No residential system in the file lists a third-party owner name that matches M D ELECTRIC & SOLAR INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 60 of M D ELECTRIC & SOLAR INC’s 60 installs name a module maker in the “Generator Manufacturer” fields, and most of those (37, 61.7%) used modules recorded as REC.

In the last 24 months, 60 of M D ELECTRIC & SOLAR INC’s 60 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (45, 75.0%) used inverters recorded as Sol-Ark.

In the last 24 months, 7 of M D ELECTRIC & SOLAR INC’s 60 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used batteries recorded as Tesla.

10 of 99 battery-paired PG&E and SCE installs (10.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC3788
Discover Energy Systems Corp.2828
SunPower1723
Fortress Power LLC10not in top list
SimpliPhi Power, Inc.5not in top list
Inverter makerSol-Ark4599
Enphase758
Tesla79
GoodWe Technologies Co., Ltd.1not in top list
Battery makerTesla79

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 178 of 181 installs, inverters on 181. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
815891M D ELECTRIC & SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorDec 16, 2002Aug 31, 2028181

License numbers are the ones the utilities recorded on the interconnection applications (181 of 181 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 815891. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Sonoma132
Mendocino49

Top cities

CityInstalls
The Sea Ranch126
Gualala35
Manchester7
Point Arena6
Annapolis2
Jenner2
Cazadero1
Cloverdale1
Mendocino1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
M D ELECTRIC & SOLAR INC181

Common questions

Where does M D ELECTRIC & SOLAR INC install solar?

Its installs are spread across 2 counties. The most are in Sonoma County (132 installs), followed by Mendocino County (49).

How often does M D ELECTRIC & SOLAR INC install batteries with solar?

54.7% of its interconnected solar installs include battery storage across all years, and 83.3% in the last 24 months (50 of 60).

How many M D ELECTRIC & SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

62 of its 181 interconnected installs (34.3% of the 181 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.