M P E SOLAR CARPORTS INC has 130 residential solar installs interconnected in California, active in the records from 2019 through 2025 (Aug 8, 2019 to May 5, 2025), most of them in San Bernardino County (103), Los Angeles County (12) and Riverside County (11). The license number recorded on most of its installs, 1044870, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
130
Last 24 months
3
Total capacity
1,133.7 kW DC
Median system size
7.9 kW DC
With battery storage
10.0% all time; 66.7% last 24 months
Third-party owned
0.8% of 130 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest May 5, 2025
Ownership types recorded
PPA 1
Median battery size
10.1 kWh (13 installs list a capacity)
First install
Aug 8, 2019
Latest install
May 5, 2025
Counties
6
Utilities
SCE 128, PGE 2
CSLB license
1044870

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201910
202010
2021110
2022625
2023476
202460
202522
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 130 interconnected installs (2.3% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved May 5, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.012797.7%11 (8.7%)
Net Billing Tariff32.3%2 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of M P E SOLAR CARPORTS INC’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches M P E SOLAR CARPORTS INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
M P E SOLAR CARPORTS INC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of M P E SOLAR CARPORTS INC’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Canadian Solar.

In the last 24 months, 3 of M P E SOLAR CARPORTS INC’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 66.7%) used inverters recorded as Enphase.

In the last 24 months, 2 of M P E SOLAR CARPORTS INC’s 3 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

9 of 13 battery-paired PG&E and SCE installs (69.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar2not in top list
LONGi144
Inverter makerEnphase247
SolarEdge161
Battery makerEnphase28

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 121 of 130 installs, inverters on 130. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1044870Not found in the CSLB License Master file pulled Nov 4, 2026130

License numbers are the ones the utilities recorded on the interconnection applications (130 of 130 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Bernardino103
Los Angeles12
Riverside11
Kern2
Orange1
Santa Barbara1

Top cities

CityInstalls
Apple Valley24
Hesperia24
Victorville22
Fontana4
Lancaster4
Phelan4
San Bernardino4
Adelanto3
Helendale3
Barstow2
Hemet2
Lake Elsinore2
Lucerne Valley2
Montclair2
Oro Grande2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
M P E SOLAR CARPORTS INC130

Common questions

Where does M P E SOLAR CARPORTS INC install solar?

Its installs are spread across 6 counties. The most are in San Bernardino County (103 installs), followed by Los Angeles County (12).

How often does M P E SOLAR CARPORTS INC install batteries with solar?

10.0% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (2 of 3).

How many M P E SOLAR CARPORTS INC installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 130 interconnected installs (2.3% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.