Mark Construction Co.

How many solar installs has Mark Construction Co. done in California, and which license number is on its installs?

Mark Construction Co. has 41 residential solar installs interconnected in California, active in the records from 2004 through 2011 (May 4, 2004 to Mar 25, 2011), most of them in El Dorado County (17), San Joaquin County (7) and Alameda County (6). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
41
Last 24 months
0
Total capacity
198.9 kW DC
Median system size
4.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 41 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
May 4, 2004
Latest install
Mar 25, 2011
Counties
10
Utilities
PGE 41
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
200420
200570
2006170
200750
200800
200980
201000
201120
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 41 interconnected installs with a tariff recorded (41) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.041100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Mark Construction Co.’s installs. No residential system in the file lists a third-party owner name that matches Mark Construction Co. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 41 of Mark Construction Co.’s 41 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (20, 48.8%) used modules recorded as SunPower.

Across all years, 41 of Mark Construction Co.’s 41 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (19, 46.3%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower020
BP Solar011
Mitsubishi Electric08
Sharp02
Inverter makerSunPower019
Xantrex Technology Inc.010
SMA07
PV Powered05

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 41 of 41 installs, inverters on 41. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 41 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
El Dorado17
San Joaquin7
Alameda6
Calaveras4
Amador2
Mendocino1
Placer1
Sonoma1
Tuolumne1
Yolo1

Top cities

CityInstalls
El Dorado Hills6
Livermore3
Shingle Springs3
Angels Camp2
Cameron Park2
Lockeford2
Stockton2
Tracy2
Avery1
Burson1
Castro Valley1
Covelo1
El Dorado1
Garden Valley1
Grizzly Flats1

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Mark Construction Co.28
Mark Construction dba The Solar Company8
Mark Construction2
Mark Construction Company1
Mark Construction dba The Solar Co1
Mark Construction dba The Solar company1

Common questions

Where does Mark Construction Co. install solar?

Its installs are spread across 10 counties. The most are in El Dorado County (17 installs), followed by San Joaquin County (7).

How often does Mark Construction Co. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Mark Construction Co. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 41 interconnected installs with a tariff recorded (41) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.