MICOR ELECTRIC

How many solar installs has MICOR ELECTRIC done in California, and which license number is on its installs?

MICOR ELECTRIC has 53 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Jun 13, 2018 to Jul 20, 2026), most of them in Contra Costa County (28), Alameda County (24) and Solano County (1). CSLB lists license 613167 (MICOR ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
53
Last 24 months
12
Total capacity
428.4 kW DC
Median system size
7.7 kW DC
With battery storage
11.3% all time; 41.7% last 24 months
Third-party owned
0.0% of 53 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Jul 20, 2026
Ownership types recorded
none recorded
Median battery size
19.6 kWh (1 installs list a capacity)
First install
Jun 13, 2018
Latest install
Jul 20, 2026
Counties
3
Utilities
PGE 53
CSLB license
613167

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201850
201950
202050
202161
202270
202380
202471
202553
2026 (through Aug 31, 2026)51

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 53 interconnected installs (13.2% of the 53 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 57.1% of those include battery storage. The latest Net Billing Tariff install was approved Jul 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04686.8%2 (4.3%)
Net Billing Tariff713.2%4 (57.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on MICOR ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches MICOR ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 12 of MICOR ELECTRIC’s 12 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 58.3%) used modules recorded as JA Solar.

In the last 24 months, 12 of MICOR ELECTRIC’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 5 of MICOR ELECTRIC’s 12 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Enphase.

6 of 6 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar77
REC314
Silfab24
Inverter makerEnphase1244
Battery makerEnphase55

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 50 of 53 installs, inverters on 53. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
613167MICOR ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorFeb 22, 1991Apr 30, 202753

License numbers are the ones the utilities recorded on the interconnection applications (53 of 53 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 613167. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Contra Costa28
Alameda24
Solano1

Top cities

CityInstalls
Livermore19
Danville12
Walnut Creek4
Lafayette3
Moraga3
Pleasanton2
San Ramon2
Alamo1
Berkeley1
Byron1
Clayton1
Fairfield1
Oakland1
Piedmont1
Pleasant Hill1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MICOR ELECTRIC39
MICOR ELECTRIC INC8
Micor electric3
Micor Electric2
micor electric1

Common questions

Where does MICOR ELECTRIC install solar?

Its installs are spread across 3 counties. The most are in Contra Costa County (28 installs), followed by Alameda County (24).

How often does MICOR ELECTRIC install batteries with solar?

11.3% of its interconnected solar installs include battery storage across all years, and 41.7% in the last 24 months (5 of 12).

How many MICOR ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 53 interconnected installs (13.2% of the 53 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 57.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.