MOUNTAIN AIRE HEATING & AIR CONDITIONING INC

How many solar installs has MOUNTAIN AIRE HEATING & AIR CONDITIONING INC done in California, and which license number is on its installs?

MOUNTAIN AIRE HEATING & AIR CONDITIONING INC has 176 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Jan 3, 2018 to Apr 14, 2026), most of them in Madera County (166), Mariposa County (7) and Fresno County (3). CSLB lists license 481394 (MOUNTAIN AIRE HEATING & AIR CONDITIONING INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
176
Last 24 months
19
Total capacity
1,432.7 kW DC
Median system size
7.4 kW DC
With battery storage
9.1% all time; 52.6% last 24 months
Third-party owned
0.0% of 176 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Feb 24, 2026
Ownership types recorded
none recorded
Median battery size
28.8 kWh (1 installs list a capacity)
First install
Jan 3, 2018
Latest install
Apr 14, 2026
Counties
3
Utilities
PGE 176
CSLB license
481394

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018220
2019200
2020160
2021190
2022320
2023380
2024158
202587
2026 (through Aug 31, 2026)61

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 176 interconnected installs (11.9% of the 176 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The latest Net Billing Tariff install was approved Feb 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.031.7%not counted
NEM 2.015286.4%0 (0.0%)
Net Billing Tariff2111.9%15 (71.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on MOUNTAIN AIRE HEATING & AIR CONDITIONING INC’s installs. No residential system in the file lists a third-party owner name that matches MOUNTAIN AIRE HEATING & AIR CONDITIONING INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 18 of MOUNTAIN AIRE HEATING & AIR CONDITIONING INC’s 19 installs name a module maker in the “Generator Manufacturer” fields, and most of those (13, 72.2%) used modules recorded as Qcells.

In the last 24 months, 19 of MOUNTAIN AIRE HEATING & AIR CONDITIONING INC’s 19 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (18, 94.7%) used inverters recorded as Enphase.

In the last 24 months, 9 of MOUNTAIN AIRE HEATING & AIR CONDITIONING INC’s 19 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 88.9%) used batteries recorded as Enphase.

14 of 16 battery-paired PG&E and SCE installs (87.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1323
JA Solar219
Silfab2105
JinkoSolar1not in top list
Shell Solar1not in top list
Inverter makerEnphase18171
SMA23
Sol-Ark11
Battery makerEnphase813
Lithion Battery Inc.11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 174 of 176 installs, inverters on 176. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names MOUNTAIN AIRE HEATING & AIR CONDITIONING INC as developer on 2 battery storage projects and as installer on 0 (0 name it as both), 2 projects in all with 23 kWh of storage. 2 have the status Paid, with $14,369 in current incentive allocations. Applications were received from Apr 3, 2022 to Nov 6, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid223$14,369

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency113$12,9411$12,941
Small Residential Storage110$1,4281$1,428

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
481394MOUNTAIN AIRE HEATING & AIR CONDITIONING INC (Corporation)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorOct 22, 1985Dec 31, 2027176

License numbers are the ones the utilities recorded on the interconnection applications (176 of 176 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 481394. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Madera166
Mariposa7
Fresno3

Top cities

CityInstalls
Coarsegold93
Oakhurst29
North Fork18
Ahwahnee8
Raymond8
Mariposa6
Bass Lake4
Fresno3
Friant2
Wishon2
Madera1
O Neals1
Wawona1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MOUNTAIN AIRE HEATING & AIR CONDITIONING INC176

Common questions

Where does MOUNTAIN AIRE HEATING & AIR CONDITIONING INC install solar?

Its installs are spread across 3 counties. The most are in Madera County (166 installs), followed by Mariposa County (7).

How often does MOUNTAIN AIRE HEATING & AIR CONDITIONING INC install batteries with solar?

9.1% of its interconnected solar installs include battery storage across all years, and 52.6% in the last 24 months (10 of 19).

How many MOUNTAIN AIRE HEATING & AIR CONDITIONING INC installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 176 interconnected installs (11.9% of the 176 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.