Nor Cal Contracting Inc

How many solar installs has Nor Cal Contracting Inc done in California, and which license number is on its installs?

Nor Cal Contracting Inc has 54 residential solar installs interconnected in California, active in the records from 2011 through 2019 (Aug 15, 2011 to Oct 1, 2019), most of them in Sonoma County (39), Marin County (7) and Napa County (6). CSLB lists license 724196 (NOR CAL SOLAR CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, D-34, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
54
Last 24 months
0
Total capacity
327.6 kW DC
Median system size
5.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 54 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Aug 15, 2011
Latest install
Oct 1, 2019
Counties
4
Utilities
PGE 54
CSLB license
724196

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201120
201230
201310
201410
201550
201680
201740
2018170
2019130
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02037.0%not counted
NEM 2.03463.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Nor Cal Contracting Inc’s installs. No residential system in the file lists a third-party owner name that matches Nor Cal Contracting Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 53 of Nor Cal Contracting Inc’s 54 installs name a module maker in the “Generator Manufacturer” fields, and most of those (35, 66.0%) used modules recorded as Canadian Solar.

Across all years, 54 of Nor Cal Contracting Inc’s 54 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 59.3%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar035
Silfab09
LG03
Solaria03
JinkoSolar01
Inverter makerSolarEdge032
SMA010
Fronius07
APsystems (Altenergy Power System)03
Enphase03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 53 of 54 installs, inverters on 54. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Nor Cal Contracting Inc as developer on 32 battery storage projects and as installer on 10 (10 name it as both), 32 projects in all with 511 kWh of storage. 5 have the status Paid, with $10,493 in current incentive allocations. Applications were received from Jul 29, 2019 to Jan 11, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid551$10,493
Cancelled27461$186,828

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage23236$46,6065$10,493
Large-Scale Storage6185$59,5240$0
Equity Resiliency391$91,1900$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
724196NOR CAL SOLAR CONSTRUCTION (Corporation)CLEARB General Building Contractor; D-34Jun 20, 1996Nov 30, 202748

License numbers are the ones the utilities recorded on the interconnection applications (48 of 54 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 724196. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Nor Cal Contracting Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019202020212024Total
unincorporated Marin County724196441110

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Sonoma39
Marin7
Napa6
Solano2

Top cities

CityInstalls
Petaluma16
Santa Rosa12
Napa6
Novato4
Rohnert Park3
Sonoma3
Glen Ellen2
San Rafael2
Sebastopol2
Benicia1
Cloverdale1
Suisun City1
Tiburon1

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Nor Cal Contracting Inc42
Nor Cal Contracting, Inc.5
NOR CAL CONTRACTING INC2
Nor Cal Contracting1
nor cal contracting Inc1
Nor cal Contracting Inc1
Nor Cal Contracting inc1
Nor Cal Contracting Inc.1

Common questions

Where does Nor Cal Contracting Inc install solar?

Its installs are spread across 4 counties. The most are in Sonoma County (39 installs), followed by Marin County (7).

How often does Nor Cal Contracting Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Nor Cal Contracting Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.