North Bay Solar Electric
How many solar installs has North Bay Solar Electric done in California, and which license number is on its installs?
North Bay Solar Electric has 165 residential solar installs interconnected in California, active in the records from 2003 through 2026 (Feb 21, 2003 to Jun 27, 2026), most of them in Sonoma County (93), Lake County (26) and Marin County (14). CSLB lists license 522296 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 165
- Last 24 months
- 3
- Total capacity
- 865.9 kW DC
- Median system size
- 4.3 kW DC
- With battery storage
- 6.1% all time; 66.7% last 24 months
- Third-party owned
- 0.0% of 165 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 3 installs, latest Mar 17, 2026
- Ownership types recorded
- none recorded
- Median battery size
- 17.3 kWh (10 installs list a capacity)
- First install
- Feb 21, 2003
- Latest install
- Jun 27, 2026
- Counties
- 9
- Utilities
- PGE 163, SCE 2
- CSLB license
- 522296
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2003 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2003 | 6 | 0 |
| 2004 | 11 | 0 |
| 2005 | 3 | 0 |
| 2006 | 6 | 0 |
| 2007 | 10 | 0 |
| 2008 | 10 | 0 |
| 2009 | 17 | 0 |
| 2010 | 13 | 0 |
| 2011 | 5 | 0 |
| 2012 | 5 | 0 |
| 2013 | 6 | 0 |
| 2014 | 3 | 0 |
| 2015 | 6 | 0 |
| 2016 | 9 | 0 |
| 2017 | 5 | 0 |
| 2018 | 2 | 0 |
| 2019 | 11 | 0 |
| 2020 | 6 | 0 |
| 2021 | 5 | 0 |
| 2022 | 10 | 3 |
| 2023 | 10 | 4 |
| 2024 | 3 | 1 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 3 | 2 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
3 of its 165 interconnected installs (1.8% of the 165 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved Mar 17, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 111 | 67.3% | not counted |
| NEM 2.0 | 51 | 30.9% | 7 (13.7%) |
| Net Billing Tariff | 3 | 1.8% | 2 (66.7%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on North Bay Solar Electric’s installs. No residential system in the file lists a third-party owner name that matches North Bay Solar Electric exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 3 of North Bay Solar Electric’s 3 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 33.3%) used modules recorded as Discover Energy Systems Corp..
In the last 24 months, 3 of North Bay Solar Electric’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 100.0%) used inverters recorded as Sol-Ark.
In the last 24 months, none of North Bay Solar Electric’s 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.
4 of 10 battery-paired PG&E and SCE installs (40.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Discover Energy Systems Corp. | 1 | not in top list |
| Fortress Power LLC | 1 | not in top list | |
| LONGi | 1 | not in top list | |
| REC | 1 | not in top list | |
| SunPower | 1 | not in top list | |
| Inverter maker | Sol-Ark | 3 | not in top list |
| Battery maker | LG | 0 | 3 |
| Stored Energy Inc | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 160 of 165 installs, inverters on 165. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 522296 | Sole owner license (name not shown) | CLEAR | C-10 Electrical Contractor | Jan 4, 1988 | Jan 31, 2028 | 70 |
License numbers are the ones the utilities recorded on the interconnection applications (70 of 165 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 522296. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list North Bay Solar Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2019 | 2021 | Total |
|---|---|---|---|---|
| unincorporated Marin County | 522296 | 1 | 3 | 4 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
| County | Installs |
|---|---|
| Sonoma | 93 |
| Lake | 26 |
| Marin | 14 |
| Solano | 14 |
| Mendocino | 8 |
| Contra Costa | 5 |
| Placer | 2 |
| Tulare | 2 |
| San Joaquin | 1 |
Top cities
| City | Installs |
|---|---|
| Sebastopol | 38 |
| Santa Rosa | 20 |
| Fairfield | 9 |
| Kelseyville | 9 |
| Petaluma | 6 |
| Cotati | 5 |
| Willits | 5 |
| Dillon Beach | 4 |
| Finley | 3 |
| Forestville | 3 |
| Guerneville | 3 |
| Healdsburg | 3 |
| Kenwood | 3 |
| Lakeport | 3 |
| Middletown | 3 |
Names as recorded by the utilities
The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| North Bay Solar Electric | 120 |
| NORTH BAY SOLAR ELECTRIC | 36 |
| North Bay Solar Electric, Inc. | 4 |
| north bay solar electric | 2 |
| North Bay solar Electric | 1 |
| North Bay Solar Electric Inc | 1 |
| North Bay, Solar Electric | 1 |
Common questions
Where does North Bay Solar Electric install solar?
Its installs are spread across 9 counties. The most are in Sonoma County (93 installs), followed by Lake County (26).
How often does North Bay Solar Electric install batteries with solar?
6.1% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (2 of 3).
How many North Bay Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?
3 of its 165 interconnected installs (1.8% of the 165 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.