Ortega R's Construction

How many solar installs has Ortega R's Construction done in California, and which license number is on its installs?

Ortega R's Construction has 58 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Aug 18, 2015 to Aug 21, 2026), most of them in Kern County (55) and Los Angeles County (3). CSLB lists license 808465 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-10, HAZ, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
58
Last 24 months
13
Total capacity
358.3 kW DC
Median system size
5.6 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 58 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
20 installs, latest Aug 21, 2026
Ownership types recorded
none recorded
First install
Aug 18, 2015
Latest install
Aug 21, 2026
Counties
2
Utilities
PGE 50, SCE 8
CSLB license
808465

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201530
201610
201750
201870
201930
202020
202140
202210
2023130
202460
202520
2026 (through Aug 31, 2026)110

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

20 of its 58 interconnected installs (34.5% of the 58 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.058.6%not counted
NEM 2.03356.9%0 (0.0%)
Net Billing Tariff2034.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Ortega R's Construction’s installs. No residential system in the file lists a third-party owner name that matches Ortega R's Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of Ortega R's Construction’s 13 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 53.8%) used modules recorded as Mission Solar.

In the last 24 months, 13 of Ortega R's Construction’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12, 92.3%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar77
Axitec36
LONGi1not in top list
SolarEver Technologia1not in top list
Trina Solar1not in top list
Inverter makerEnphase1256
SolarEdge12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 58 of 58 installs, inverters on 58. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
808465Sole owner license (name not shown)CLEARA General Engineering Contractor; B General Building Contractor; C-10 Electrical Contractor; HAZMay 23, 2002May 31, 202855

License numbers are the ones the utilities recorded on the interconnection applications (57 of 58 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 808465. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern55
Los Angeles3

Top cities

CityInstalls
Bakersfield44
Delano3
Arvin2
Buttonwillow2
Tehachapi2
Lancaster1
Palmdale1
Santa Clarita1
Shafter1
Taft1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ORTEGA R'S CONSTRUCTION47
Ortega R's Construction11

Common questions

Where does Ortega R's Construction install solar?

Its installs are spread across 2 counties. The most are in Kern County (55 installs), followed by Los Angeles County (3).

How often does Ortega R's Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 13).

How many Ortega R's Construction installs are under NEM 3.0 (the Net Billing Tariff)?

20 of its 58 interconnected installs (34.5% of the 58 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.