PAVLETICH ELECTRIC AND COMMUNICATIONS INC

How many solar installs has PAVLETICH ELECTRIC AND COMMUNICATIONS INC done in California, and which license number is on its installs?

PAVLETICH ELECTRIC AND COMMUNICATIONS INC has 218 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 7, 2019 to Apr 27, 2026), most of them in Kern County (215), San Luis Obispo County (2) and Tulare County (1). CSLB lists license 719733 (PAVLETICH ELECTRIC AND COMMUNICATIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-7, C-10, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
218
Last 24 months
8
Total capacity
2,151.1 kW DC
Median system size
8.8 kW DC
With battery storage
1.4% all time; 0.0% last 24 months
Third-party owned
0.0% of 218 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
11 installs, latest Sep 11, 2024
Ownership types recorded
none recorded
First install
Oct 7, 2019
Latest install
Apr 27, 2026
Counties
3
Utilities
PGE 209, SCE 9
CSLB license
719733

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019140
2020470
2021410
2022450
2023480
2024203
202520
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

11 of its 218 interconnected installs (5.0% of the 218 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 27.3% of those include battery storage. The latest Net Billing Tariff install was approved Sep 11, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.020795.0%0 (0.0%)
Net Billing Tariff115.0%3 (27.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PAVLETICH ELECTRIC AND COMMUNICATIONS INC’s installs. No residential system in the file lists a third-party owner name that matches PAVLETICH ELECTRIC AND COMMUNICATIONS INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 7 of PAVLETICH ELECTRIC AND COMMUNICATIONS INC’s 8 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 57.1%) used modules recorded as Waaree.

In the last 24 months, 8 of PAVLETICH ELECTRIC AND COMMUNICATIONS INC’s 8 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 87.5%) used inverters recorded as Enphase.

In the last 24 months, none of PAVLETICH ELECTRIC AND COMMUNICATIONS INC’s 8 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerWaaree442
SunPower2147
Axitec15
Inverter makerEnphase776
SolarEdge16
Battery makerSunPower03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 206 of 218 installs, inverters on 218. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
719733PAVLETICH ELECTRIC AND COMMUNICATIONS INC (Corporation)CLEARA General Engineering Contractor; B General Building Contractor; C-7; C-10 Electrical ContractorMar 6, 1996Mar 31, 2028218

License numbers are the ones the utilities recorded on the interconnection applications (218 of 218 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 719733. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Kern215
San Luis Obispo2
Tulare1

Top cities

CityInstalls
Bakersfield197
Shafter6
Tehachapi3
Keene2
Lake Isabella2
Taft2
Cayucos1
Dustin Acres1
Kernville1
Lost Hills1
Pismo Beach1
Porterville1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PAVLETICH ELECTRIC AND COMMUNICATIONS INC217
Pavletich Electric and Communications Inc1

Common questions

Where does PAVLETICH ELECTRIC AND COMMUNICATIONS INC install solar?

Its installs are spread across 3 counties. The most are in Kern County (215 installs), followed by San Luis Obispo County (2).

How often does PAVLETICH ELECTRIC AND COMMUNICATIONS INC install batteries with solar?

1.4% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 8).

How many PAVLETICH ELECTRIC AND COMMUNICATIONS INC installs are under NEM 3.0 (the Net Billing Tariff)?

11 of its 218 interconnected installs (5.0% of the 218 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 27.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.