Pav Solar, Inc.
How many solar installs has Pav Solar, Inc. done in California, and which license number is on its installs?
Pav Solar, Inc. has 306 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jul 14, 2015 to Apr 30, 2026), most of them in Kern County (298), Fresno County (3) and Tulare County (3). CSLB lists license 1022652 (PAV ENGINEERING) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, expires Jan 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to Pav Solar, Inc. here carry more than one CSLB license number: 1022652 on 178 (CSLB holder PAV ENGINEERING, Bakersfield) and 719733 on 128 (CSLB holder PAVLETICH ELECTRIC AND COMMUNICATIONS INC, Bakersfield), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 306
- Last 24 months
- 35
- Total capacity
- 2,617.5 kW DC
- Median system size
- 8 kW DC
- With battery storage
- 0.3% all time; 2.9% last 24 months
- Third-party owned
- 0.3% of 306 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 31 installs, latest Apr 30, 2026
- Ownership types recorded
- lease 1
- First install
- Jul 14, 2015
- Latest install
- Apr 30, 2026
- Counties
- 4
- Utilities
- PGE 298, SCE 8
- CSLB license
- 1022652, 719733
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2015 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2015 | 36 | 0 |
| 2016 | 87 | 0 |
| 2017 | 65 | 0 |
| 2018 | 50 | 0 |
| 2019 | 31 | 0 |
| 2020 | 0 | 0 |
| 2021 | 1 | 0 |
| 2022 | 0 | 0 |
| 2023 | 1 | 0 |
| 2024 | 0 | 0 |
| 2025 | 19 | 0 |
| 2026 (through Aug 31, 2026) | 16 | 1 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
31 of its 306 interconnected installs (10.1% of the 306 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 30, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 126 | 41.2% | not counted |
| NEM 2.0 | 149 | 48.7% | 1 (0.7%) |
| Net Billing Tariff | 31 | 10.1% | 0 (0.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 1 of Pav Solar, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Pav Solar, Inc. exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| SunPower | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 35 of Pav Solar, Inc.’s 35 installs name a module maker in the “Generator Manufacturer” fields, and most of those (25, 71.4%) used modules recorded as Hyundai.
In the last 24 months, 35 of Pav Solar, Inc.’s 35 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (34, 97.1%) used inverters recorded as Enphase.
In the last 24 months, 1 of Pav Solar, Inc.’s 35 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.
1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Hyundai | 25 | 30 |
| Qcells | 7 | not in top list | |
| SunPower | 2 | 102 | |
| JA Solar | 1 | not in top list | |
| Waaree | 1 | not in top list | |
| Inverter maker | Enphase | 34 | 62 |
| SolarEdge | 1 | 52 | |
| Tesla | 1 | not in top list | |
| Battery maker | Enphase | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 303 of 306 installs, inverters on 306. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1022652 | PAV ENGINEERING (Corporation) | CLEAR | A General Engineering Contractor | Jan 18, 2017 | Jan 31, 2027 | 178 |
| 719733 | PAVLETICH ELECTRIC AND COMMUNICATIONS INC (Corporation) | CLEAR | A General Engineering Contractor; B General Building Contractor; C-7; C-10 Electrical Contractor | Mar 6, 1996 | Mar 31, 2028 | 128 |
License numbers are the ones the utilities recorded on the interconnection applications (306 of 306 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1022652, 719733. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- PAV ENGINEERING: 161 installs, license 1022652
- PAVLETICH ELECTRIC AND COMMUNICATIONS INC: 218 installs, license 719733
Counties
| County | Installs |
|---|---|
| Kern | 298 |
| Fresno | 3 |
| Tulare | 3 |
| San Luis Obispo | 2 |
Top cities
| City | Installs |
|---|---|
| Bakersfield | 287 |
| Tehachapi | 5 |
| Shafter | 4 |
| Visalia | 3 |
| Clovis | 2 |
| Fresno | 1 |
| Paso Robles | 1 |
| Taft | 1 |
| Templeton | 1 |
| Wasco | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 13 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| PAV SOLAR | 92 |
| Pav Solar, Inc. | 89 |
| Pav Solar | 64 |
| Pav Solar Inc. | 26 |
| Pav Solar Inc | 10 |
| pav solar | 6 |
| PAV SOLAR INC | 6 |
| PAV Solar | 4 |
| pav solar inc | 3 |
| Pav-Solar Inc. | 3 |
| Pav Solar inc | 1 |
| PAV Solar, Inc. | 1 |
| PAV-SOLAR INC | 1 |
Common questions
Where does Pav Solar, Inc. install solar?
Its installs are spread across 4 counties. The most are in Kern County (298 installs), followed by Fresno County (3).
How often does Pav Solar, Inc. install batteries with solar?
0.3% of its interconnected solar installs include battery storage across all years, and 2.9% in the last 24 months (1 of 35).
How many Pav Solar, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?
31 of its 306 interconnected installs (10.1% of the 306 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.