Quattro Solar

How many solar installs has Quattro Solar done in California, and which license number is on its installs?

Quattro Solar has 137 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Apr 17, 2012 to Jan 25, 2026), most of them in Marin County (73), Sonoma County (27) and Napa County (12). CSLB lists license 954020 (QUATTRO SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
137
Last 24 months
7
Total capacity
867.3 kW DC
Median system size
5 kW DC
With battery storage
27.7% all time; 71.4% last 24 months
Third-party owned
0.0% of 137 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Jan 25, 2026
Ownership types recorded
none recorded
Median battery size
16 kWh (32 installs list a capacity)
First install
Apr 17, 2012
Latest install
Jan 25, 2026
Counties
10
Utilities
PGE 137
CSLB license
954020

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201220
201320
201480
201590
201680
2017160
2018294
2019215
2020139
202176
202276
202331
202452
202542
2026 (through Aug 31, 2026)33

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 137 interconnected installs (5.1% of the 137 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The latest Net Billing Tariff install was approved Jan 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03424.8%not counted
NEM 2.09670.1%32 (33.3%)
Net Billing Tariff75.1%5 (71.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Quattro Solar’s installs. No residential system in the file lists a third-party owner name that matches Quattro Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 7 of Quattro Solar’s 7 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 57.1%) used modules recorded as Canadian Solar.

In the last 24 months, 7 of Quattro Solar’s 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 71.4%) used inverters recorded as Sol-Ark.

In the last 24 months, 2 of Quattro Solar’s 7 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as ElectrIQ.

15 of 38 battery-paired PG&E and SCE installs (39.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar428
MidNite Solar Inc.4not in top list
REC3not in top list
LG19
Inverter makerSol-Ark515
SMA216
ElectrIQ1not in top list
Battery makerElectrIQ11
Lithion Battery Inc.12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 115 of 137 installs, inverters on 137. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Quattro Solar as developer on 14 battery storage projects and as installer on 24 (14 name it as both), 24 projects in all with 743 kWh of storage. 14 have the status Paid, with $50,263 in current incentive allocations. Applications were received from Jun 5, 2017 to Jan 14, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid14180$50,263
Cancelled10563$425,199

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage19231$69,03014$50,263
Large-Scale Storage4139$39,6580$0
Equity Resiliency1374$366,7740$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
954020QUATTRO SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorOct 29, 2010Sep 30, 2028132

License numbers are the ones the utilities recorded on the interconnection applications (132 of 137 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 954020. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Quattro Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021Total
unincorporated Marin County954020755118

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Marin73
Sonoma27
Napa12
Alameda10
Contra Costa6
Mendocino4
Solano2
El Dorado1
Lake1
San Mateo1

Top cities

CityInstalls
San Rafael15
Mill Valley14
Novato13
Petaluma12
San Anselmo9
Napa6
Santa Rosa6
Oakland5
Saint Helena5
Sonoma5
Berkeley4
Fairfax4
Ukiah4
Sausalito3
Corte Madera2

Names as recorded by the utilities

The utilities recorded this installer under 10 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
QUATTRO SOLAR INC43
Quattro Solar35
Quattro Solar Inc30
Quattro Solar Inc.12
QUATTRO SOLAR7
QUATTRO SOLAR, INC.5
Quattro Solar, Inc.2
Quattro solar1
Quattro SOlar1
Quattro Solar, INC.1

Common questions

Where does Quattro Solar install solar?

Its installs are spread across 10 counties. The most are in Marin County (73 installs), followed by Sonoma County (27).

How often does Quattro Solar install batteries with solar?

27.7% of its interconnected solar installs include battery storage across all years, and 71.4% in the last 24 months (5 of 7).

How many Quattro Solar installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 137 interconnected installs (5.1% of the 137 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.