ROSS ROOFING & CONSTRUCTION INC

How many solar installs has ROSS ROOFING & CONSTRUCTION INC done in California, and which license number is on its installs?

ROSS ROOFING & CONSTRUCTION INC has 44 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Feb 29, 2016 to Jul 13, 2026), most of them in Monterey County (41), San Benito County (2) and Santa Cruz County (1). CSLB lists license 836222 (ROSS ROOFING & CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
44
Last 24 months
4
Total capacity
287 kW DC
Median system size
6.1 kW DC
With battery storage
9.1% all time; 50.0% last 24 months
Third-party owned
0.0% of 44 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Dec 29, 2025
Ownership types recorded
none recorded
First install
Feb 29, 2016
Latest install
Jul 13, 2026
Counties
3
Utilities
PGE 44
CSLB license
836222

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
201700
201800
201950
202080
202140
202260
2023152
202421
202521
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 44 interconnected installs (9.1% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 29, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.3%not counted
NEM 2.03988.6%2 (5.1%)
Net Billing Tariff49.1%2 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ROSS ROOFING & CONSTRUCTION INC’s installs. No residential system in the file lists a third-party owner name that matches ROSS ROOFING & CONSTRUCTION INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of ROSS ROOFING & CONSTRUCTION INC’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used modules recorded as Solaria.

In the last 24 months, 4 of ROSS ROOFING & CONSTRUCTION INC’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 2 of ROSS ROOFING & CONSTRUCTION INC’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

4 of 4 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolaria38
REC12
Inverter makerEnphase441
Battery makerEnphase24

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 44 of 44 installs, inverters on 44. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
836222ROSS ROOFING & CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; C-39 Roofing ContractorApr 17, 2004Apr 30, 202844

License numbers are the ones the utilities recorded on the interconnection applications (44 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 836222. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Monterey41
San Benito2
Santa Cruz1

Top cities

CityInstalls
Salinas13
Carmel10
Pebble Beach6
Carmel Valley4
Hollister2
Marina2
Pacific Grove2
Seaside2
Carmel by the Sea1
Monterey1
Santa Cruz1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ROSS ROOFING & CONSTRUCTION INC43
Ross Roofing & Construction Inc.1

Common questions

Where does ROSS ROOFING & CONSTRUCTION INC install solar?

Its installs are spread across 3 counties. The most are in Monterey County (41 installs), followed by San Benito County (2).

How often does ROSS ROOFING & CONSTRUCTION INC install batteries with solar?

9.1% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (2 of 4).

How many ROSS ROOFING & CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 44 interconnected installs (9.1% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.