S C S

How many solar installs has S C S done in California, and which license number is on its installs?

S C S has 128 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Aug 22, 2021 to May 26, 2026), most of them in Los Angeles County (122), Alameda County (4) and Santa Clara County (1). CSLB lists license 459945 (S C S) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-36, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
128
Last 24 months
30
Total capacity
515.4 kW DC
Median system size
2 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
1.6% of 128 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
47 installs, latest May 26, 2026
Ownership types recorded
PPA 1, other 1
First install
Aug 22, 2021
Latest install
May 26, 2026
Counties
4
Utilities
SCE 122, PGE 6
CSLB license
459945

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202120
2022180
2023380
2024450
2025230
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

47 of its 128 interconnected installs (36.7% of the 128 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved May 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.08163.3%0 (0.0%)
Net Billing Tariff4736.7%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of S C S’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches S C S exactly.

Third-party owner named on its installsInstalls
ACME FAMILY APARTMENTS, INC.1
Vivint Solar Developer, LLC.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 29 of S C S’ 30 installs name a module maker in the “Generator Manufacturer” fields, and most of those (26, 89.7%) used modules recorded as Trina Solar.

In the last 24 months, 30 of S C S’ 30 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (19, 63.3%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar26124
Canadian Solar11
LG11
VSUN (Vietnam Sunergy)11
Inverter makerEnphase1973
SolarEdge839
Apsystem11
SMA1not in top list
Tesla12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 127 of 128 installs, inverters on 128. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
459945S C S (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-36Jul 23, 1984Nov 30, 2027128

License numbers are the ones the utilities recorded on the interconnection applications (128 of 128 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 459945. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list S C S’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
unincorporated San Diego County45994511

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles122
Alameda4
Santa Clara1
Sonoma1

Top cities

CityInstalls
Gardena90
South el Monte32
Union City3
Oakland1
San Jose1
Santa Rosa1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
S C S128

Common questions

Where does S C S install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (122 installs), followed by Alameda County (4).

How often does S C S install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 30).

How many S C S installs are under NEM 3.0 (the Net Billing Tariff)?

47 of its 128 interconnected installs (36.7% of the 128 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.