Scudder Solar Energy Systems

How many solar installs has Scudder Solar Energy Systems done in California, and which license number is on its installs?

Scudder Solar Energy Systems has 39 residential solar installs interconnected in California, active in the records from 2013 through 2023 (Aug 20, 2013 to Oct 5, 2023), most of them in Monterey County (33), Santa Clara County (3) and Santa Cruz County (2). CSLB lists license 902095 (SCUDDER SOLAR ELECTRICAL ENERGY SYSTEMS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
39
Last 24 months
0
Total capacity
218.7 kW DC
Median system size
4.9 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
2.6% of 39 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 1
First install
Aug 20, 2013
Latest install
Oct 5, 2023
Counties
4
Utilities
PGE 39
CSLB license
902095

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201350
201400
2015260
201600
201700
201860
201910
202000
202100
202200
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 39 interconnected installs with a tariff recorded (39) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03179.5%not counted
NEM 2.0820.5%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Scudder Solar Energy Systems’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Scudder Solar Energy Systems exactly.

Third-party owner named on its installsInstalls
Sunrun Inc1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 39 of Scudder Solar Energy Systems’ 39 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (13, 33.3%) used modules recorded as SunPower.

Across all years, 39 of Scudder Solar Energy Systems’ 39 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (11, 28.2%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower013
Canadian Solar011
SolarWorld05
Suniva05
Cogenra02
Inverter makerEnphase011
SolarEdge010
SMA09
SunPower07
ABB01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 39 installs, inverters on 39. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Scudder Solar Energy Systems as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 26 kWh of storage. 1 have the status Paid, with $6,960 in current incentive allocations. Applications were received from Oct 19, 2018 to Oct 19, 2018.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid126$6,960

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage126$6,9601$6,960

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
902095SCUDDER SOLAR ELECTRICAL ENERGY SYSTEMS (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorAug 15, 2007Aug 31, 202734

License numbers are the ones the utilities recorded on the interconnection applications (34 of 39 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 902095. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Monterey33
Santa Clara3
Santa Cruz2
San Benito1

Top cities

CityInstalls
Salinas13
Monterey6
Carmel4
Seaside3
Los Altos Hills2
Pacific Grove2
Carmel Valley1
Chualar1
Felton1
Gilroy1
Hollister1
King City1
Marina1
Pebble Beach1
Watsonville1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Scudder Solar Energy Systems39

Common questions

Where does Scudder Solar Energy Systems install solar?

Its installs are spread across 4 counties. The most are in Monterey County (33 installs), followed by Santa Clara County (3).

How often does Scudder Solar Energy Systems install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Scudder Solar Energy Systems installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 39 interconnected installs with a tariff recorded (39) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.