Sensible Solar Construction

How many solar installs has Sensible Solar Construction done in California, and which license number is on its installs?

Sensible Solar Construction has 34 residential solar installs interconnected in California, active in the records from 2010 through 2023 (Feb 22, 2010 to Jul 10, 2023), most of them in Sonoma County (29), Marin County (2) and Napa County (2). CSLB lists license 347355 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
34
Last 24 months
0
Total capacity
186.8 kW DC
Median system size
4.8 kW DC
With battery storage
5.9% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Feb 22, 2010
Latest install
Jul 10, 2023
Counties
4
Utilities
PGE 34
CSLB license
347355

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201030
201140
201230
201320
201410
201500
201630
201730
201810
201930
202040
202130
202232
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01647.1%not counted
NEM 2.01852.9%2 (11.1%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sensible Solar Construction’s installs. No residential system in the file lists a third-party owner name that matches Sensible Solar Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 32 of Sensible Solar Construction’s 34 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (10, 31.3%) used modules recorded as Sharp.

Across all years, 34 of Sensible Solar Construction’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (27, 79.4%) used inverters recorded as Enphase.

Across all years, 2 of Sensible Solar Construction’s 34 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSharp010
SolarWorld010
Qcells07
Silfab02
Evergreen Solar01
Inverter makerEnphase027
SMA06
Fronius01
SunPower01
Battery makerEnphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 32 of 34 installs, inverters on 34. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
347355Sole owner license (name not shown)CLEARB General Building ContractorNov 15, 1977Jan 31, 202721

License numbers are the ones the utilities recorded on the interconnection applications (21 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 347355. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Sensible Solar Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated Marin County34735511

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Sonoma29
Marin2
Napa2
Lake1

Top cities

CityInstalls
Santa Rosa15
Windsor5
Healdsburg3
Cloverdale2
Sonoma2
Calistoga1
Geyserville1
Loch Lomond1
Mill Valley1
Napa1
Novato1
Sebastopol1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sensible Solar Construction22
SENSIBLE SOLAR CONSTRUCTION12

Common questions

Where does Sensible Solar Construction install solar?

Its installs are spread across 4 counties. The most are in Sonoma County (29 installs), followed by Marin County (2).

How often does Sensible Solar Construction install batteries with solar?

5.9% of its interconnected solar installs include battery storage across all years.

How many Sensible Solar Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.