Solar Coast Construction

How many solar installs has Solar Coast Construction done in California, and which license number is on its installs?

Solar Coast Construction has 48 residential solar installs interconnected in California, active in the records from 2014 through 2017 (Aug 20, 2014 to Oct 9, 2017), most of them in Monterey County (43), San Benito County (3) and Santa Clara County (1). CSLB lists license 415377 (sole owner license, name not shown) with status Contr Bond Susp in the License Master file pulled Nov 4, 2026, classifications B, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
48
Last 24 months
0
Total capacity
258.8 kW DC
Median system size
4.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
29.2% of 48 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 5, lease 6, prepaid lease 3
First install
Aug 20, 2014
Latest install
Oct 9, 2017
Counties
4
Utilities
PGE 48
CSLB license
415377

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201440
2015220
2016210
201710
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 48 interconnected installs with a tariff recorded (48) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04797.9%not counted
NEM 2.012.1%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 14 of Solar Coast Construction’s installs the utility recorded a third-party ownership type: PPA 5, lease 6, prepaid lease 3, other 0. No residential system in the file lists a third-party owner name that matches Solar Coast Construction exactly.

Third-party owner named on its installsInstalls
Sunrun8
California First4
Repower2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 46 of Solar Coast Construction’s 48 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14, 30.4%) used modules recorded as LG.

Across all years, 48 of Solar Coast Construction’s 48 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (43, 89.6%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG014
Qcells014
SolarWorld010
REC08
Inverter makerEnphase043
SMA03
SolarEdge03
Fronius01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 46 of 48 installs, inverters on 48. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
415377Sole owner license (name not shown)Contr Bond SuspB General Building ContractorDec 11, 1981Feb 29, 202845

License numbers are the ones the utilities recorded on the interconnection applications (47 of 48 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 415377. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Monterey43
San Benito3
Santa Clara1
Santa Cruz1

Top cities

CityInstalls
Salinas14
Carmel7
Monterey6
Marina5
Hollister3
Seaside3
Greenfield2
King City2
Pacific Grove2
Carmel Valley1
San Jose1
Sand City1
Watsonville1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar Coast Construction43
solar Coast Construction3
Solar Coast Construction dba Solar Unive2

Common questions

Where does Solar Coast Construction install solar?

Its installs are spread across 4 counties. The most are in Monterey County (43 installs), followed by San Benito County (3).

How often does Solar Coast Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Solar Coast Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 48 interconnected installs with a tariff recorded (48) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.