STAN VAN MIERLO BUILDERS

How many solar installs has STAN VAN MIERLO BUILDERS done in California, and which license number is on its installs?

STAN VAN MIERLO BUILDERS has 57 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Aug 10, 2020 to Jul 9, 2026), most of them in San Bernardino County (50), Riverside County (6) and Los Angeles County (1). CSLB lists license 492618 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
57
Last 24 months
9
Total capacity
590.4 kW DC
Median system size
10.8 kW DC
With battery storage
12.3% all time; 66.7% last 24 months
Third-party owned
0.0% of 57 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
11 installs, latest Jul 9, 2026
Ownership types recorded
none recorded
Median battery size
28.6 kWh (7 installs list a capacity)
First install
Aug 10, 2020
Latest install
Jul 9, 2026
Counties
3
Utilities
SCE 57
CSLB license
492618

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202090
202140
2022200
2023120
202431
202532
2026 (through Aug 31, 2026)64

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

11 of its 57 interconnected installs (19.3% of the 57 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 63.6% of those include battery storage. The latest Net Billing Tariff install was approved Jul 9, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04680.7%0 (0.0%)
Net Billing Tariff1119.3%7 (63.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on STAN VAN MIERLO BUILDERS’s installs. No residential system in the file lists a third-party owner name that matches STAN VAN MIERLO BUILDERS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of STAN VAN MIERLO BUILDERS’ 9 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 66.7%) used modules recorded as EG4.

In the last 24 months, 9 of STAN VAN MIERLO BUILDERS’ 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 66.7%) used inverters recorded as EG4.

In the last 24 months, none of STAN VAN MIERLO BUILDERS’ 9 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 7 battery-paired PG&E and SCE installs (14.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerEG466
Hyperion Solar4not in top list
Aptos Solar15
JinkoSolar1not in top list
LONGi1not in top list
Inverter makerEG466
Enphase218
APsystems (Altenergy Power System)11
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 54 of 57 installs, inverters on 57. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
492618Sole owner license (name not shown)CLEARB General Building ContractorMay 29, 1986Feb 28, 202757

License numbers are the ones the utilities recorded on the interconnection applications (57 of 57 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 492618. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Bernardino50
Riverside6
Los Angeles1

Top cities

CityInstalls
Phelan18
Victorville8
Hesperia7
Apple Valley5
Blythe4
Oak Hills4
Pinon Hills4
Adelanto2
Joshua Tree1
Long Beach1
Murrieta1
Perris1
Yucaipa1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
STAN VAN MIERLO BUILDERS57

Common questions

Where does STAN VAN MIERLO BUILDERS install solar?

Its installs are spread across 3 counties. The most are in San Bernardino County (50 installs), followed by Riverside County (6).

How often does STAN VAN MIERLO BUILDERS install batteries with solar?

12.3% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (6 of 9).

How many STAN VAN MIERLO BUILDERS installs are under NEM 3.0 (the Net Billing Tariff)?

11 of its 57 interconnected installs (19.3% of the 57 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 63.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.