SYMMETRIC ENERGY LLC

How many solar installs has SYMMETRIC ENERGY LLC done in California, and which license number is on its installs?

SYMMETRIC ENERGY LLC has 48 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Oct 7, 2021 to Nov 24, 2025), most of them in Marin County (38), Sonoma County (6) and Alameda County (1). The license number recorded on most of its installs, 1077102, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
48
Last 24 months
4
Total capacity
431.1 kW DC
Median system size
8.1 kW DC
With battery storage
62.5% all time; 50.0% last 24 months
Third-party owned
0.0% of 48 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Apr 3, 2024
Ownership types recorded
none recorded
Median battery size
22.2 kWh (7 installs list a capacity)
First install
Oct 7, 2021
Latest install
Nov 24, 2025
Counties
6
Utilities
PGE 48
CSLB license
1077102

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202111
2022117
20232315
2024105
202532
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 48 interconnected installs (6.3% of the 48 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The latest Net Billing Tariff install was approved Apr 3, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.1%not counted
NEM 2.04491.7%28 (63.6%)
Net Billing Tariff36.3%1 (33.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SYMMETRIC ENERGY LLC’s installs. No residential system in the file lists a third-party owner name that matches SYMMETRIC ENERGY LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of SYMMETRIC ENERGY LLC’s 4 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used modules recorded as REC.

In the last 24 months, 4 of SYMMETRIC ENERGY LLC’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 2 of SYMMETRIC ENERGY LLC’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

25 of 30 battery-paired PG&E and SCE installs (83.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC217
United Renewable Energy28
Inverter makerEnphase439
Battery makerEnphase221

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 44 of 48 installs, inverters on 48. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SYMMETRIC ENERGY LLC as developer on 28 battery storage projects and as installer on 3 (3 name it as both), 28 projects in all with 887 kWh of storage. 19 have the status Paid, with $80,109 in current incentive allocations. Applications were received from Nov 6, 2019 to Dec 18, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid19334$80,109
Reserved1410$102,536
Cancelled8143$43,808

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage20332$58,76914$38,737
Large-Scale Storage5507$124,0203$19,168
Equity Resiliency348$43,6642$22,204

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1077102Not found in the CSLB License Master file pulled Nov 4, 202643

License numbers are the ones the utilities recorded on the interconnection applications (48 of 48 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Marin38
Sonoma6
Alameda1
Contra Costa1
Napa1
San Mateo1

Top cities

CityInstalls
Mill Valley5
Novato5
Tiburon5
San Anselmo4
San Rafael4
Corte Madera3
Bolinas2
Glen Ellen2
Petaluma2
Ross2
Sausalito2
Stinson Beach2
Berkeley1
Fairfax1
Healdsburg1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SYMMETRIC ENERGY LLC43
SYMMETRIC ENERGY2
Symmetric energy INC2
Symmetric energy Inc1

Common questions

Where does SYMMETRIC ENERGY LLC install solar?

Its installs are spread across 6 counties. The most are in Marin County (38 installs), followed by Sonoma County (6).

How often does SYMMETRIC ENERGY LLC install batteries with solar?

62.5% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (2 of 4).

How many SYMMETRIC ENERGY LLC installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 48 interconnected installs (6.3% of the 48 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.