TOP HAT SOLAR INC

How many solar installs has TOP HAT SOLAR INC done in California, and which license number is on its installs?

TOP HAT SOLAR INC has 45 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Dec 8, 2022 to May 14, 2026), most of them in Shasta County (44) and Tehama County (1). CSLB lists license 1090292 (HUFFT SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, D-34, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
45
Last 24 months
4
Total capacity
534.1 kW DC
Median system size
11.7 kW DC
With battery storage
2.2% all time; 0.0% last 24 months
Third-party owned
0.0% of 45 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Dec 8, 2022
Latest install
May 14, 2026
Counties
2
Utilities
PGE 45
CSLB license
1090292

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202210
2023351
202450
202510
2026 (through Aug 31, 2026)30

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 45 interconnected installs with a tariff recorded (45) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.2%not counted
NEM 2.04497.8%1 (2.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on TOP HAT SOLAR INC’s installs. No residential system in the file lists a third-party owner name that matches TOP HAT SOLAR INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of TOP HAT SOLAR INC’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Qcells.

In the last 24 months, 4 of TOP HAT SOLAR INC’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of TOP HAT SOLAR INC’s 4 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells219
REC118
Inverter makerEnphase433
SMA1not in top list
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 37 of 45 installs, inverters on 45. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1090292HUFFT SOLAR INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; D-34Apr 20, 2022Apr 30, 202845

License numbers are the ones the utilities recorded on the interconnection applications (45 of 45 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1090292. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list TOP HAT SOLAR INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
City and County of San Francisco109029244

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Shasta44
Tehama1

Top cities

CityInstalls
Anderson15
Palo Cedro11
Redding9
Cottonwood3
Millville3
Bella Vista1
Lakehead1
Manton1
Mcarthur1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TOP HAT SOLAR INC45

Common questions

Where does TOP HAT SOLAR INC install solar?

Its installs are spread across 2 counties. The most are in Shasta County (44 installs), followed by Tehama County (1).

How often does TOP HAT SOLAR INC install batteries with solar?

2.2% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 4).

How many TOP HAT SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 45 interconnected installs with a tariff recorded (45) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.