Weldon Robinson corporation DBA KV Solar Supply

How many solar installs has Weldon Robinson corporation DBA KV Solar Supply done in California, and which license number is on its installs?

Weldon Robinson corporation DBA KV Solar Supply has 44 residential solar installs interconnected in California, active in the records from 2007 through 2014 (May 24, 2007 to May 1, 2014), most of them in Kern County (42), Riverside County (1) and San Bernardino County (1). The license number recorded on most of its installs, 867062, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
44
Last 24 months
0
Total capacity
221.7 kW DC
Median system size
4.6 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
4.5% of 44 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 2
First install
May 24, 2007
Latest install
May 1, 2014
Counties
3
Utilities
SCE 44
CSLB license
867062

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200720
200820
200940
2010150
201150
2012100
201340
201420
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.044100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of Weldon Robinson corporation DBA KV Solar Supply’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 2. Across all installers, 1 residential systems list a third-party owner name that matches Weldon Robinson corporation DBA KV Solar Supply exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
KV Solar Supply1
Weldon Robinson corporation DBA KV Solar Supply1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 44 of Weldon Robinson corporation DBA KV Solar Supply’s 44 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 72.7%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Inverter makerSunPower032
SMA012

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 0 of 44 installs, inverters on 44. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
867062Not found in the CSLB License Master file pulled Nov 4, 202644

License numbers are the ones the utilities recorded on the interconnection applications (44 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Kern42
Riverside1
San Bernardino1

Top cities

CityInstalls
Ridgecrest25
Inyokern10
Lake Isabella6
Bodfish1
Palm Springs1
Trona1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Weldon Robinson corporation DBA KV Solar Supply44

Common questions

Where does Weldon Robinson corporation DBA KV Solar Supply install solar?

Its installs are spread across 3 counties. The most are in Kern County (42 installs), followed by Riverside County (1).

How often does Weldon Robinson corporation DBA KV Solar Supply install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Weldon Robinson corporation DBA KV Solar Supply installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.