How many solar installs has Western Pacific Solar Corp done in California, and which license number is on its installs?

Western Pacific Solar Corp has 92 residential solar installs interconnected in California, active in the records from 2008 through 2014 (Jul 11, 2008 to Feb 7, 2014), most of them in Sonoma County (77), Napa County (7) and Mendocino County (3). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
92
Last 24 months
0
Total capacity
439.2 kW DC
Median system size
4.3 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 92 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 11, 2008
Latest install
Feb 7, 2014
Counties
8
Utilities
PGE 92
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200840
2009110
2010110
2011250
2012180
2013200
201430
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 92 interconnected installs with a tariff recorded (92) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.092100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Western Pacific Solar Corp’s installs. No residential system in the file lists a third-party owner name that matches Western Pacific Solar Corp exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 92 of Western Pacific Solar Corp’s 92 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 22.8%) used modules recorded as Sharp.

Across all years, 92 of Western Pacific Solar Corp’s 92 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (63, 68.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSharp021
Canadian Solar020
SolarWorld020
BP Solar014
Evergreen Solar05
Inverter makerEnphase063
Fronius010
SMA06
Power-One04
Kaco03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 92 of 92 installs, inverters on 92. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 92 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Sonoma77
Napa7
Mendocino3
Contra Costa1
El Dorado1
Lake1
Marin1
Sutter1

Top cities

CityInstalls
Santa Rosa26
Sebastopol8
Rohnert Park7
Healdsburg5
Petaluma5
Sonoma5
Windsor5
Cloverdale4
Saint Helena4
Glen Ellen3
Napa2
Ukiah2
American Canyon1
Bodega Bay1
Cotati1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Western Pacific Solar Corp60
Western Pacific Solar24
Western Pacific Solar Corp.4
Western Pacific Solar Corporation1
Western Pacific Solar Inc1
Western Pacific Solar Inc.1
Western Pacific Solar, Inc1

Common questions

Where does Western Pacific Solar Corp install solar?

Its installs are spread across 8 counties. The most are in Sonoma County (77 installs), followed by Napa County (7).

How often does Western Pacific Solar Corp install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Western Pacific Solar Corp installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 92 interconnected installs with a tariff recorded (92) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.