Home solar in ZIP code 91945, California

Service city recorded on most installs: Lemon Grove. County: San Diego County.

How many homes in ZIP code 91945 have solar?

PG&E, SCE and SDG&E interconnected 2,415 residential solar systems in ZIP code 91945 through Aug 31, 2026, 221 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Lemon Grove, San Diego County, as the service city on 2,415 of them. Sunrun has the most installs recorded in this ZIP, 329.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
2,415
Last 24 months
221 (Sep 2024 through Aug 2026)
Capacity
12.7 MW DC
Median system size
4.7 kW DC
Net Billing Tariff (NEM 3.0)
337 installs, 14.0% of those with a tariff recorded
Utility
SDGE 2,415
First install in data
Aug 30, 2001
Latest install in data
Aug 25, 2026

Installs by year

YearInstalls interconnected
20011
20021
20031
20040
20050
20065
20071
20081
20091
20108
201114
201237
201352
201474
2015139
2016202
2017124
2018159
2019189
2020222
2021176
2022232
2023380
2024207
2025120
2026 (through Aug 31, 2026)69

Battery storage

Battery storage is not recorded here: SDG&E files a battery as its own project record, not on the solar record, so this ZIP has no battery share.

Net metering tariff

Of the 2,415 installs with a net metering tariff recorded: NEM 1.0 463 (19.2%), NEM 2.0 1,615 (66.9%), the Net Billing Tariff (often called NEM 3.0) 337 (14.0%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

38.5% of the 2,178 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 1,339 are recorded as not third-party owned. Ownership types recorded: PPA 709, lease 100, prepaid lease 7, other 23.

Installers by installs in 91945

Installers with a page in this index, most installs in this ZIP first. 233 such installers have at least one install here. 47 more installs were by 43 installer names without a page in this index. 60 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 91945Last 24 months
Sunrun32972
Tesla Energy Operations (formerly SolarCity)1885
Bright Planet Solar17023
Vivint Solar Developer, LLC1260
Semper Solaris Construction Inc1246
SunPower12219
Baker Electric, Inc.865
Freedom Solar Co615
Solartech436
New Power370

City and county recorded for 91945

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Lemon Grove2,415
County: San Diego County2,415

Common questions

How common are home batteries with solar in 91945?

Battery storage is not recorded here: SDG&E files a battery as its own project record, not on the solar record, so this ZIP has no battery share.

How many solar installs in 91945 are under NEM 3.0?

337 of the 2,415 installs here with a tariff recorded (14.0%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 91945?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (329), Tesla Energy Operations (formerly SolarCity) (188), Bright Planet Solar (170). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.