New Power

How many solar installs has New Power done in California, and which license number is on its installs?

New Power has 1,189 residential solar installs interconnected in California, active in the records from 2016 through 2022 (May 2, 2016 to Jun 20, 2022), most of them in San Diego County (866), San Bernardino County (121) and Riverside County (97). The license number recorded on most of its installs, 1013855, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,189
Last 24 months
0
Total capacity
5,187.4 kW DC
Median system size
3.9 kW DC
With battery storage
0.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
4.5% of 1,189 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 51, lease 2
Median battery size
4.2 kWh (2 installs list a capacity)
First install
May 2, 2016
Latest install
Jun 20, 2022
Counties
8
Utilities
SDGE 874, SCE 314, PGE 1
CSLB license
1013855

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016340
20171660
20183111
20193341
20201830
20211530
202280
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 1,189 interconnected installs with a tariff recorded (1,189) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0373.1%not counted
NEM 2.01,15296.9%2 (0.7%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 53 of New Power’s installs the utility recorded a third-party ownership type: PPA 51, lease 2, prepaid lease 0, other 0. Across all installers, 18 residential systems list a third-party owner name that matches New Power exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Spruce24
New Power18
Sunrun5
Sun Run4
Cory Vanderpool1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1,174 of New Power’s 1,189 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1,140, 97.1%) used modules recorded as Hyundai.

Across all years, 1,189 of New Power’s 1,189 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (940, 79.1%) used inverters recorded as Enphase.

0 of 2 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai01,140
JinkoSolar017
REC012
Qcells02
Enphase01
Inverter makerEnphase0940
SolarEdge0247
ABB01
APsystems (Altenergy Power System)01
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,174 of 1,189 installs, inverters on 1,189. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names New Power as developer on 1 battery storage project and as installer on 2 (1 name it as both), 2 projects in all with 33 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Oct 21, 2020 to May 11, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled233$22,388

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency117$16,7880$0
Large-Scale Storage116$5,6000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1013855Not found in the CSLB License Master file pulled Nov 4, 20261,172

License numbers are the ones the utilities recorded on the interconnection applications (1,186 of 1,189 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list New Power’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021Total
unincorporated San Diego County101385558603323174

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego866
San Bernardino121
Riverside97
Los Angeles85
Orange14
Kern4
Contra Costa1
Ventura1

Top cities

CityInstalls
San Diego299
Chula Vista76
El Cajon74
Lancaster60
Santee58
Spring Valley57
La Mesa54
Escondido53
National City42
Lemon Grove37
Lakeside31
Fontana28
Moreno Valley28
Poway25
San Marcos25

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
New Power975
NEW POWER INC173
New Power Inc22
NEW POWER11
New Power Inc.4
New power2
New Power inc1
NEW POWER INC.1

Common questions

Where does New Power install solar?

Its installs are spread across 8 counties. The most are in San Diego County (866 installs), followed by San Bernardino County (121).

How often does New Power install batteries with solar?

0.6% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many New Power installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 1,189 interconnected installs with a tariff recorded (1,189) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.