Home solar in ZIP code 93953, California
Service city recorded on most installs: Pebble Beach. County: Monterey County.
How many homes in ZIP code 93953 have solar?
PG&E, SCE and SDG&E interconnected 253 residential solar systems in ZIP code 93953 through Aug 31, 2026, 62 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Pebble Beach, Monterey County, as the service city on 253 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 37.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 253
- Last 24 months
- 62 (Sep 2024 through Aug 2026)
- Capacity
- 2,018.6 kW DC
- Median system size
- 7 kW DC
- Net Billing Tariff (NEM 3.0)
- 55 installs, 21.7% of those with a tariff recorded
- Utility
- PGE 253
- First install in data
- Jan 16, 2003
- Latest install in data
- Aug 14, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2003 | 1 | 0 |
| 2004 | 0 | 0 |
| 2005 | 1 | 0 |
| 2006 | 1 | 0 |
| 2007 | 1 | 0 |
| 2008 | 1 | 0 |
| 2009 | 4 | 0 |
| 2010 | 3 | 0 |
| 2011 | 2 | 0 |
| 2012 | 0 | 0 |
| 2013 | 3 | 0 |
| 2014 | 9 | 0 |
| 2015 | 13 | 0 |
| 2016 | 9 | 0 |
| 2017 | 8 | 0 |
| 2018 | 16 | 1 |
| 2019 | 12 | 5 |
| 2020 | 11 | 6 |
| 2021 | 9 | 4 |
| 2022 | 26 | 11 |
| 2023 | 40 | 19 |
| 2024 | 30 | 22 |
| 2025 | 38 | 22 |
| 2026 (through Aug 31, 2026) | 15 | 11 |
Battery storage
39.9% of the residential solar installs here include battery storage across all years (101 of 253). In the last 24 months the share was 66.1% (41 of 62).
Net metering tariff
Of the 253 installs with a net metering tariff recorded: NEM 1.0 50 (19.8%), NEM 2.0 148 (58.5%), the Net Billing Tariff (often called NEM 3.0) 55 (21.7%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
7.5% of the 253 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 234 are recorded as not third-party owned. Ownership types recorded: PPA 14, lease 2, prepaid lease 1, other 2.
Installers by installs in 93953
Installers with a page in this index, most installs in this ZIP first. 48 such installers have at least one install here. 17 more installs were by 12 installer names without a page in this index. 8 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 93953 | Last 24 months |
|---|---|---|
| Tesla Energy Operations (formerly SolarCity) | 37 | 7 |
| Solex | 36 | 4 |
| SCUDDER SOLAR ELECTRICAL ENERGY SYSTEMS | 20 | 10 |
| Western Sun Systems | 14 | 1 |
| Sunrun | 12 | 1 |
| SOLARTECTURE | 9 | 2 |
| Dority Roofing Inc. | 8 | 4 |
| PREMO & TORRES SOLAR ELECTRIC JV | 8 | 6 |
| Scudder Roofing Sun Energy Systems | 8 | 0 |
| BRIGHT FUTURE ENERGY | 7 | 2 |
City and county recorded for 93953
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Pebble Beach | 253 |
| County: Monterey County | 253 |
Common questions
How common are home batteries with solar in 93953?
39.9% of the residential solar installs here include battery storage across all years (101 of 253). In the last 24 months the share was 66.1% (41 of 62).
How many solar installs in 93953 are under NEM 3.0?
55 of the 253 installs here with a tariff recorded (21.7%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 93953?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (37), Solex (36), SCUDDER SOLAR ELECTRICAL ENERGY SYSTEMS (20). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.