Home solar in ZIP code 94303, California
Service city recorded on most installs: East Palo Alto. County: San Mateo County.
How many homes in ZIP code 94303 have solar?
PG&E, SCE and SDG&E interconnected 695 residential solar systems in ZIP code 94303 through Aug 31, 2026, 109 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded East Palo Alto, San Mateo County, as the service city on 679 of them. Vivint Solar Developer, LLC has the most installs recorded in this ZIP, 100.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 695
- Last 24 months
- 109 (Sep 2024 through Aug 2026)
- Capacity
- 3,653.9 kW DC
- Median system size
- 4.4 kW DC
- Net Billing Tariff (NEM 3.0)
- 114 installs, 16.4% of those with a tariff recorded
- Utility
- PGE 695
- First install in data
- Dec 28, 2001
- Latest install in data
- Aug 28, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2001 | 1 | 0 |
| 2002 | 6 | 0 |
| 2003 | 5 | 0 |
| 2004 | 14 | 0 |
| 2005 | 1 | 0 |
| 2006 | 1 | 0 |
| 2007 | 1 | 0 |
| 2008 | 3 | 0 |
| 2009 | 1 | 0 |
| 2010 | 1 | 0 |
| 2011 | 2 | 0 |
| 2012 | 12 | 0 |
| 2013 | 9 | 0 |
| 2014 | 49 | 0 |
| 2015 | 38 | 0 |
| 2016 | 89 | 0 |
| 2017 | 62 | 0 |
| 2018 | 33 | 1 |
| 2019 | 35 | 2 |
| 2020 | 47 | 4 |
| 2021 | 43 | 2 |
| 2022 | 52 | 8 |
| 2023 | 43 | 2 |
| 2024 | 46 | 29 |
| 2025 | 61 | 54 |
| 2026 (through Aug 31, 2026) | 40 | 36 |
Battery storage
19.9% of the residential solar installs here include battery storage across all years (138 of 695). In the last 24 months the share was 88.1% (96 of 109).
Net metering tariff
Of the 695 installs with a net metering tariff recorded: NEM 1.0 234 (33.7%), NEM 2.0 347 (49.9%), the Net Billing Tariff (often called NEM 3.0) 114 (16.4%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
40.0% of the 695 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 417 are recorded as not third-party owned. Ownership types recorded: PPA 219, lease 30, prepaid lease 1, other 28.
Installers by installs in 94303
Installers with a page in this index, most installs in this ZIP first. 111 such installers have at least one install here. 8 more installs were by 8 installer names without a page in this index. 16 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 94303 | Last 24 months |
|---|---|---|
| Vivint Solar Developer, LLC | 100 | 0 |
| Tesla Energy Operations (formerly SolarCity) | 96 | 6 |
| Sunrun | 81 | 30 |
| GRID Alternatives | 60 | 3 |
| BRIGHT OPS | 36 | 36 |
| BETTER EARTH ELECTRIC INC | 22 | 1 |
| FREEDOM FOREVER LLC | 20 | 1 |
| Byldan Corporation | 17 | 0 |
| American Array Solar | 13 | 0 |
| SunPower | 12 | 0 |
City and county recorded for 94303
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: East Palo Alto | 679 |
| City: Palo Alto | 15 |
| County: San Mateo County | 352 |
| County: Santa Clara County | 343 |
1 other city value on 1 install, each under 1% of this ZIP’s installs, are not listed.
Common questions
How common are home batteries with solar in 94303?
19.9% of the residential solar installs here include battery storage across all years (138 of 695). In the last 24 months the share was 88.1% (96 of 109).
How many solar installs in 94303 are under NEM 3.0?
114 of the 695 installs here with a tariff recorded (16.4%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 94303?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Vivint Solar Developer, LLC (100), Tesla Energy Operations (formerly SolarCity) (96), Sunrun (81). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.