Home solar in ZIP code 95006, California

Service city recorded on most installs: Boulder Creek. County: Santa Cruz County.

How many homes in ZIP code 95006 have solar?

PG&E, SCE and SDG&E interconnected 319 residential solar systems in ZIP code 95006 through Aug 31, 2026, 46 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Boulder Creek, Santa Cruz County, as the service city on 318 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 43.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
319
Last 24 months
46 (Sep 2024 through Aug 2026)
Capacity
2,172.1 kW DC
Median system size
6.3 kW DC
Net Billing Tariff (NEM 3.0)
46 installs, 14.4% of those with a tariff recorded
Utility
PGE 319
First install in data
Aug 3, 2001
Latest install in data
Aug 13, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200120
200210
200350
200410
200560
200620
200770
200810
200930
201010
2011120
201220
2013100
2014100
2015150
2016130
2017180
2018192
2019185
2020156
2021168
20223015
20233810
20243821
20252619
2026 (through Aug 31, 2026)106

Battery storage

28.8% of the residential solar installs here include battery storage across all years (92 of 319). In the last 24 months the share was 67.4% (31 of 46).

Net metering tariff

Of the 319 installs with a net metering tariff recorded: NEM 1.0 93 (29.2%), NEM 2.0 180 (56.4%), the Net Billing Tariff (often called NEM 3.0) 46 (14.4%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

10.7% of the 319 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 285 are recorded as not third-party owned. Ownership types recorded: PPA 30, lease 3, other 1.

Installers by installs in 95006

Installers with a page in this index, most installs in this ZIP first. 81 such installers have at least one install here. 26 more installs were by 21 installer names without a page in this index. 13 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95006Last 24 months
Tesla Energy Operations (formerly SolarCity)434
Allterra Solar372
Sunrun243
Solar Technologies183
SANDBAR136
FREEDOM FOREVER LLC71
Earth Electric Inc61
Independent Energy Systems60
Day One Solar50
Real Goods Solar50

City and county recorded for 95006

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Boulder Creek318
County: Santa Cruz County319

1 other city value on 1 install, each under 1% of this ZIP’s installs, are not listed.

Common questions

How common are home batteries with solar in 95006?

28.8% of the residential solar installs here include battery storage across all years (92 of 319). In the last 24 months the share was 67.4% (31 of 46).

How many solar installs in 95006 are under NEM 3.0?

46 of the 319 installs here with a tariff recorded (14.4%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95006?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (43), Allterra Solar (37), Sunrun (24). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.